Login
| TI Ref No : | 530932266 |
|---|---|
| Description : | P - Execution Of Projects; Gdansk Branch; Tczew. 543.23 Adaptation Of The Station To New Load Conditions; From The Z-105 Connector, Build A Yakxs 4x120 Cable Connection To The Cable And Measurement Connector Located On The Border Of Plot 560/97; Pruszcz G |
| Date : | 2026-03-28 |
| Deadline : | 2026-04-03 |
| Document Type : | Tenders |