Login
| TI Ref No : | 530590939 |
|---|---|
| Description : | Contract Awarded For Hwk_spgk_reconstruction Of The Ahrtalbahn, Railway Line 3000 - Walporzheim To Ahrbrück 9 Steel Bridges Railway, 5 Prestressed Concrete Bridges Road, 2 Frame Structures, 14.897 Km Of Track, 4 Switches, 6 Stations, Cable Excavation, Ear |
| Date : | 2026-03-19 |
| Deadline : | 2026-05-04 |
| Document Type : | Contracts |