Login
| TI Ref No : | 530058238 |
|---|---|
| Description : | Contract Awarded For : 2026-020 Residential Flexibility the Ofgem Clean Power 2030 Action Plan Cpap Requires Around 10-12gw Of Consumer Led Flexibility By 2030, With This Value Increasing By 2035 With More Electric Vehicle Ev Uptake And Bi-directional Ch |
| Date : | 2026-03-08 |
| Deadline : | 2026-05-26 |
| Document Type : | Contracts |