Login
| TI Ref No : | 527740408 |
|---|---|
| Description : | Contract Awarded For Reconstruction Of The Rüssdorf Tunnel With Track Shifting In 3 Non-forked Sections on The Single-track Line 6269, Between The Stations Berga (elster) And Greiz At Km 21.9+51 To 22.2+15, The Rüßdorf Tunnel Is To Be Partially Renewed Us |
| Date : | 2026-01-20 |
| Deadline : | 2026-02-18 |
| Document Type : | Contracts |