Filter Search


Transportation


Location Summary Deadline
India Widening And Strengthening/reconstruction Of Barmasia Pwd Road To Saharghati Road (total Length-8.130 Km) Under Road Division Dumka For The Year 2025-26. 2026-03-09
India Sets Of Seats & Berths For L.h.b Amrit Bharat Coaches. .#* Set Of Seats For Lhb Gs Amrit Bharat Coaches. Follow Cushioning Material either Pu Foam To To Rdso Spec. Rdso/2007/cg-04 Rev. 01 Or Silicon Foam To Rdso/2013/cg- 13 Rev. 01 With Fire Properties Co 2026-03-09
India Suspension Tube (casted) .#* Suspension Tube (casted) To Hitachi Drg No. 10p.701.898 Alt-19 And Confirming To Clw specn. 4tms.095.003 Rev-1 Alt-3 And To Rdsos Str No. 0018, Rev. 1 [ Warranty Period: 30 Mont hs After The Date Of Delivery ] ] 2026-03-09
Germany Baggage Reconciliation System 2026-03-09
India Supply And Installation Of Double Acting Ac Compartment Swing Door assembly For Ac Coaches As Per Icf Drg No. -icf/sk3-5-6-014 Col-i & Col-ii alt-h Or Latest And Retrofitment In Existing Coaches As Per Icf/ Sk3-5-6- 019 .#* Supply And Installation Of Doub 2026-03-09
India Silent Block. .#* Silent Block For Aar-h Coupler (rev.03) To M/s. Sona Blw D Rg. No. 1c101060069 Or Articulat ed Spheroelastic Rubber Bearing Sanrok Drg. No. 1ed-4454 Or Spheroelastic Bearing Frontier Drg. No. Fasl /sb/0848 Rev-02 Or Equivalent Of High Te 2026-03-09
India Execution Of P.way Works Like Trr(p), Tbr, Ttr And Renewal Of Sejs & Glued joints, Deep Screening Of Point & Crossing And Other Track Work Under The jurisdiction Of Assistant Divisional Engineer/brajrajnagar Of Bilaspur Division. 2026-03-09
India Supporter .#* Supporter. Confirming To Plasser Part No. Re20.304, Sub. Part No. Re11.09.3005, Acceptable Make:- Pla sser Or Equivalent [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2026-03-09
India Design ,supply, Installation, Alteration,testing And Commisioning Of Hot Stand By electronic Interlocking (hitachi Make)system And Outdoor Signalling Systems In connection With Track Circuiting Work At Sevaliya Station For Wtps Siding Under Dy cste Constr 2026-03-09
India One Set Of Ss Tubes And Double Ferrule .#* One Set Of Ss Tubes And Double Ferrule For Brake Piping Arrangement Of Lhb Bogies Consisting Of 1. Bulk Head Elbow (with Conical Seating) 3/4-in ch Od X M26 X 1.5(m) To Drg. No. Icf/std-3-5-113 Item-1, Alt -c, Qt 2026-03-09
Whats app