Filter Search


Transportation


Location Summary Deadline
India Heavy Duty Cage Clamp Type Connector For Power And Control 16 Pin consisting Of Following Item (1) Male Insert-01 No (2) Female Insert-0ino (3) Male crimp Pin 16nos. (4) Female Crimp Pin-16nos (5) Base With Two Lever -01no (6) hood-01 No. Accepted Make - 2026-03-06
India Rfid Tag As Per Gsi Standards And As Per The Cris Specification No. 2016/cris/ndls- itpi/ws-c/policy/rfid/0101/pt-1 (v4,1) Or Latest. .#* Rfid Tag As Per Gsi Standards And As Per The Cris Specification No. 2016/cris/ndls-itpi/ws- c/policy/rfid/0101/pt-1 ( 2026-03-06
India Smart Wagon - Applied / Release Hand Brake Monitoring Module /brake System health Monitoring Module (order No. 4) 2026-03-06
India Supply Of A Kit For Rotary Shaft For C3w Valve, Which Includes Eight Specific Items Necessary For The Operation Of Brake Equipment In Alco And Electric Locomotives. Kit For Rotary Shaft For C3w Valve 2026-03-06
India 25 Kv Ac Ohe Work In Connection With 1) Development Of Wani Goods Shed 2) conversion Of Loop Lines Having Favourable Cross Over Into Common Loop Line At 6 stations In Nagpur Division Of Central Railway. 2026-03-06
India 25kv Ohe Work In Connection With "construction Of New Lhs In Lieu Of 07 Nos. Lc gates. 24/02 , 8/3,17/a/t,17/a/1,12/a/1,18,17/a/6" By Railways Relieving Girder under Aen/ndae & Aen/kwae In Howrah Division Of Eastern Railway. 2026-03-06
India Provision Of Integrated Passenger Information System Such As Cgs, Tib,pa System Etc At Bxr, Dnr, Jaj & Zna (cib At additional Pf) And Ppta, Bta, Koo, Dure,htz & Brya Stations Under Danapur Division. 2026-03-06
India South Central Railway - Construction Organization - Secunderabad Division - proposed Doubling Between Dornakal Junction - Bhadrachalam Road Section: execution Of Earth Work In Embankment, Blanketing To Rdso Standards, construction/extension Of Minor Bridg 2026-03-06
India 25 Kv Ac Ohe Work In Connection With 1) Development Of Wani Goods Shed 2) conversion Of Loop Lines Having Favourable Cross Over Into Common Loop Line At 6 stations In Nagpur Division Of Central Railway. 2026-03-06
India Chute Complete For Wash Basin Outlet Pipe Drawing No:- F-6-3-061, Alt (p) & (35) items-1&2 .#* Chute Complete For Wash Basin Outlet Pipe Drawing No:- F-6-3-061, Alt (p) & (35) Items-1& 2 [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity 2026-03-06
Whats app