Filter Search


Transportation


Location Summary Deadline
Germany Compression Mq In Westphalia, 2.ba 2026-03-12
Netherlands Work Platforms For The New Metro Depot 2026-03-12
India Running Contract For One Year For Supply Of End Cut Metal Liner As Per Rdso drawing No. T-8746/9681 & Supply Of End Cut Metal Liner As Per Rdso Drg. No t-4511/3740 .#* Supply Of End Cut Metal Liner As Per Rdso Drg. No T-4511/3740 Alt. 1 Or Latest Alt, If 2026-03-12
India Overhauling Kit For Lru, Control Portion; .#* Overhauling Kit For Lru, Control Portion; Bp 787321-1994 (bp-cp) Of M/s. Knorr-bremse cb As Per Annexure [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2026-03-12
India District Land Acquisition Office (construction Of Two Lane With Paved Shoulder For Mirganj Bypass Ch. 0.00 To Ch3.180 Km (total Length-3.180 Km)). 2026-03-12
India Physical Efficiency Test (pet) For The Position Of Driver Constable In Bihar Police 2026-03-12
Brazil Electronic Auction - The Purpose Of This Procedure Is The Eventual Acquisition Of Foodstuffs Intended To Serve The Students Of The João Da Silva State School, Through The National School Meal Program/pnae, In Accordance With The Conditions, Quantities And 2026-03-12
India Lever For Bogie Brake. .#* Lever For Bogie Brake. (with Bogie Mounted Brake Cylinder For Ac Coach.) Drawing No.:- wtac- 3 -2 - 402, Alt. ( L ) , Item -1 [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Cat 2026-03-12
India Back Cover Fiber Glass Reinforced Plastic Molding For Tap Changer Case .#* Back Cover Fiber Glass Reinforced Plastic Molding For Tap Changer Case As Per Drg. No. emu / 175 /87, Alt A, Item No. 3 [ Warranty Period: 30 Months After The Date Of Delivery ] [q 2026-03-12
Germany Framework Agreement For Temporary Contract Work Of The City Of Nordhausen; Delivery Of Bulk Materials And Transport Services 2026-03-12
Whats app