Filter Search


Transportation


Location Summary Deadline
France Traffic Studies: Road Counts, Simulations And Other Traffic Studies For The Needs Of Greater Avignon 2026-03-30
France Arrangement And Maintenance Of Public Spaces 2026-03-30
France Traffic Studies 2026-03-30
India Construction Of 4 Lanning Of Ujjain Jhalawar Section Of Nh 552g From Ch. 132.526 Village Chanvali To Ch. 159.263 Jhalawar (junction With Nh52) (package 4) In The State Of Rajasthan On Hybrid Annuity Mode (ham) Under Nh(o) 2026-03-30
India Sub Kit Ioh-2b For Tap Changer N-32 As Per Annexure R-3 Of Rdso Tc No. rdso/2010/el/tc/0102 Rev "1" & Amendment No. 1,one Kit Consisting Of 22+17( hardware Items As Per Annexure Ioh-hw-3) .#* Sub Kit Ioh-2b For Tap Changer N-32 As Per Annexure R-3 Of Rdso 2026-03-30
India Sub Kit Ioh-2b For Tap Changer N-32 As Per Annexure R-3 Of Rdso Tc No. rdso/2010/el/tc/0102 Rev "1" & Amendment No. 1,one Kit Consisting Of 22+17( hardware Items As Per Annexure Ioh-hw-3) .#* Sub Kit Ioh-2b For Tap Changer N-32 As Per Annexure R-3 Of Rdso 2026-03-30
-Construction-Of-High-Level-Bridge-At>India -Construction-Of-High-Level-Bridge-At>Construction Of High Level Bridge At Km 99/2 Across Kallar River Including Approaches From Km 98/800 - 99/400 Of Nh 136 (thanjavur - Thiruvaiyaru -perambalur -krishnapuram -athur Road) In The State Of Tamilnadu.
Construction Of High Level Bridge At
-Construction-Of-High-Level-Bridge-At>2026-03-30
India Rehabilitation And Up.gradation Of Guhagar Chiplun Helwak Road From Existing Km 26.890 To 403.610, Design Km 26.230 To 403.000 Nh 166 E Length 13.77 Km Two Lanes With Paved Shoulders Configuration In The State Of Maharashtra On Engineering, Procureme 2026-03-30
Bulgaria Restoration Of The Project Parameters Of The Railway, The Contact Network, And The Signaling And Telecommunications Systems In The Section Yastrebovo - Vetovo 2026-03-30
India The Project Involves The Supply, Installation, And Commissioning Of A Hydraulic Coil Spring Scragging Machine With A Capacity Of 40 Tons. Additionally, A Comprehensive Annual Maintenance Contract (camc) For Five Years Is Required Post-warranty. Coil Sprin 2026-03-30
Whats app