Filter Search


Transportation


Location Summary Deadline
India Construction Of 4 Lanning Of Badnawar-petlawad Thandla-timarwani Section Of (nh-752d) From Badnawar Bypass Ch.70.400 To Timarwani Interchange Of Delhi Mumbai Expressway (ne-4) Ch.150.850 In The State Of Madhya Pradesh On Ham Under Nh(o) 2026-02-25
India Widening And Upgradation To Lane With Paved Shoulder From Km 114.650 (shahpura Bypass) To Km 158.650 (jahazpur) Of Gulabpura Uniara Section Of Nh 148d Total Length 44.00 Km Under Nh(o) 2026-02-25
India Upgrad Of Exist. 4l Corridor From Km 71.000 From Purvanchal Expressway To Km 102.000 Start Of Ghazipur Zamania Saiyad Raja Sec Of Nh24 Tl 30 Km In Uttar Pradesh On Ham Mode Pkg I 2026-02-25
India Const. Of 4l Gf Corridor Ghazipur Zamania Saiyad Raja Of Nh24 Old Nh97 With Extens. Up To Varanasi Ranchi Kolkata Corridor Km 0.000 To Km 51.850 Tl 51.850 Km In Uttar Pradesh On Ham Mode Pkg Ii 2026-02-25
Egypt Construction Of Depot 2026-02-25
India Improvement And Rectification Works At 5 Nos. Of Morth-identified Black Spot Locations Through Long Term Measures On Lucknow Kanpur Section Of Old Nh-25 (new Nh-27) (km 27.700 To Km 75.500) In The State Of Uttar Pradesh. 2026-02-25
India Const Of Gr Separated Structure At 24.907 Abhava Jn 25.720 Mindhola Jn 27.121 Khajod Jn Include Re Walls Service Rd And Drains Along With Missing Service Rd And Conversion Of Earthen Shoulder To Ps On Hazira Port Surat Gj/mh Border Of Nh53 In Gj On E 2026-02-25
Nepal Goods Procurement For Nepal Telecom. 2026-02-25
India Glass Shutter Assembly (with Lock) Movable Etc. .#* Glass Shutter Assembly (with Lock) Movable For Emu Coaches Of Air Spring suspension System To Icfs Drg.no. Emu/4c/asr-5-4-402 Item No.3 Alt. "e". [ Warranty Period: 30 Months After The Date Of Delivery ] 2026-02-25
Switzerland Pbl Labor Services 2026-02-25
Whats app