Filter Search


Transportation


Location Summary Deadline
India Preparation Of Land Use And Development Control Paln Ludcp And Land Use Map A Register Lumr As Per The Provision Of West Bengal Town And Country Planning And Development Act 1979 As Amended Up To Till Date Ludcp And Lumr Is To Be Prepared For An Area 2026-02-24
-Amtala-Baruipur-Road-From-6.30-Km-To-7.24-Km,-Strengthening-Work-Under-South-24-Parganas-Division-Pwd-In-The-District-Of-South-24-Parganas-During-The-Year-2025-26>India -Amtala-Baruipur-Road-From-6.30-Km-To-7.24-Km,-Strengthening-Work-Under-South-24-Parganas-Division-Pwd-In-The-District-Of-South-24-Parganas-During-The-Year-2025-26>Wbpwd/sse/sc/niet-23/2025-2026
Amtala Baruipur Road From 6.30 Km To 7.24 Km, Strengthening Work Under South 24 Parganas Division Pwd In The District Of South 24 Parganas During The Year 2025-26
-Amtala-Baruipur-Road-From-6.30-Km-To-7.24-Km,-Strengthening-Work-Under-South-24-Parganas-Division-Pwd-In-The-District-Of-South-24-Parganas-During-The-Year-2025-26>2026-02-24
India Overhauling Of Crusher Motor And Shifting, Replacement, Coupling Removal/refitting. 6.6 Kv, 560 Kw Crusher Motor 2026-02-24
India Surfacing Work For Roads Under Birbhum Division, Pwd. 2026-02-24
India Surfacing Work For Roads Under Birbhum Division, Pwd. 2026-02-24
India Surfacing Work By 40 Mm Thick Bituminous Layer In Stages With Pc & Sc Under Asansol Division, P.w.dte 2026-02-24
India Strengthening Works On Dhantala Biprit Road Under Uttar Dinajpur Highway Division. 2026-02-24
-Baruipur-Champahati-Road-Permanent-Restoration-Work-For-2800m-Of-Trench-Ch.-4.250km.-Kata-Khal-To-7.050km.-Champahati-Battala-Rs-Caused-Due-To-Construction-Of-Storm-Water-Rcc-Surface-Drain-Work-Of-K.m.d.a-Under-South-2>India -Baruipur-Champahati-Road-Permanent-Restoration-Work-For-2800m-Of-Trench-Ch.-4.250km.-Kata-Khal-To-7.050km.-Champahati-Battala-Rs-Caused-Due-To-Construction-Of-Storm-Water-Rcc-Surface-Drain-Work-Of-K.m.d.a-Under-South-2>Wbpwd/sse/sc/niet-22/2025-2026
Baruipur Champahati Road Permanent Restoration Work For 2800m Of Trench Ch. 4.250km. Kata Khal To 7.050km. Champahati Battala Rs Caused Due To Construction Of Storm Water Rcc Surface Drain Work Of K.m.d.a Under South 2
-Baruipur-Champahati-Road-Permanent-Restoration-Work-For-2800m-Of-Trench-Ch.-4.250km.-Kata-Khal-To-7.050km.-Champahati-Battala-Rs-Caused-Due-To-Construction-Of-Storm-Water-Rcc-Surface-Drain-Work-Of-K.m.d.a-Under-South-2>2026-02-24
-For-The-Purpose-Of-Running-Chaupati-(for-Selling-Of-Eatables-Like-Veg/non-veg-Items-Or-Other-Essential-Goods-For-Daily>India -For-The-Purpose-Of-Running-Chaupati-(for-Selling-Of-Eatables-Like-Veg/non-veg-Items-Or-Other-Essential-Goods-For-Daily>To License Out Open Space For The Purpose Of Running Chaupati Adjacent Parking, Church Play Ground, Hardyal Road, Jalandhar Cantt
For The Purpose Of Running Chaupati (for Selling Of Eatables Like Veg/non-veg Items Or Other Essential Goods For Daily
-For-The-Purpose-Of-Running-Chaupati-(for-Selling-Of-Eatables-Like-Veg/non-veg-Items-Or-Other-Essential-Goods-For-Daily>2026-02-24
Canada F1705-250723 - Tug And Barge Services - Aids To Navigation - Cordero Channel 2026-02-24
Whats app