Filter Search


Transportation


Location Summary Deadline
India The Contract Involves Comprehensive Annual Maintenance Of The Ip-based Video Surveillance System Installed In Coaches Of Indian Railways. This Includes Servicing Full Hd Ip Cameras, Microphones, Mobile Network Video Recorders, System Software, Cabling, An 2026-02-24
India Secondary Vertical Damper For Lhb Coaches Etc. .#* Secondary Vertical Damper For Lhb Coaches To Rdso Drg. No. Rdso/cg/drg/21046, Alt. 3, Confirming To Rdso Spec. Rdso/cg-18005 Rev.02 (amendment 1 Of June 25) [ Warranty Period: 72 Months After The Date Of 2026-02-24
Germany S 177 Conversion As Wilsdruff A4, Lsa Southern Kp 4 2026-02-24
India Distributor Valve Ke1ipkslwith Pressure Converter (rlv) & Distributor Valve adopter Assembly For Air Brake System Of Lhb Coaches. Part No.:- M/s Knorr bremse Part No. I.2.765 & .i.2.724 Or Description:- Integral Volume Relay (consisting Of Distributor Val 2026-02-24
Germany Passenger Transport By Bus According To The Pbefg; Mvv Regional Bus Route 695 2026-02-24
Netherlands Mowing Roadsides 2026-02-24
India Supply Of Track Rubber Shoes, Specifically Part Number H1730080, Manufactured By Colmar And Eurotrac. The Items Are Categorized As Goods And Are Non-stock. Track Rubber Shoes 2026-02-24
India Fixing Rubber Profile Emu/gzb .#* Fixing Rubber Profile Emu/gzb Drg. No. Emu/m2/sk-140/2011, Item No.1 For Bus type Window Glass. [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total 2026-02-24
Spain 19-m-14450; 54.1053/25 Actions To Improve The Accessibility Of Public Transport On The South Highway, A-4, Between The Industrial Estates Of Los Molinos And San Marcos, P.k. 12,000 Of The A-4 And Avda. Leonardo Da Vinci (overpass P.k. 15,200 Of The A-4) P 2026-02-24
Germany Passenger Transport By Bus According To The Pbefg; Mvv Regional Bus Route 695 2026-02-24
Whats app