Filter Search


Transportation


Location Summary Deadline
India Procurement Of Spares For Track Machines .#* Wear Strip As Per Plasser Part No. Rm08.25.2150.02 With Rdso Dr No. Rdso/tm/16/22 And Rdso Specification No. Tm/hm/ 6/15 Rev-2, Make- Plasser Or Equivalent ] 2026-07-06
India Axle Box Housing Finished. .#* Axle Box Housing Finished To Icf Drg. No. T-0-2-602 Alt V/14,item No.2, With Rdso Specn N o. Rdso-2007-cg-08 Of March 2008 With Amendment Slip No.1 Of July 2009 [ Warranty Period: 30 Mont hs After The Date Of Delivery ] ] 2026-07-06
Bosnia and Herzegovina Transportation Of Workers 2026-07-06
India Constant Contact Poly Urethane Side Bearer Pad. .#* Constant Contact Poly Urethane Side Bearer Pad To Rdso Specification No. Wd-38- Misc-2004 (re v 3 Of April 2025), Design-b. [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance ( 2026-07-06
-Balance-Work-Under-Risk-And-Cost-For-Construction-And-Upgradation-Of-Existing-Road-To-2--Lane-With-Paved-Shoulders-Including-Geometric-Improvement-Of-Section-From-Start-Of-Bagrakot-To-Kafer-Km-13.00-To-Km-25.600-(pac>India -Balance-Work-Under-Risk-And-Cost-For-Construction-And-Upgradation-Of-Existing-Road-To-2--Lane-With-Paved-Shoulders-Including-Geometric-Improvement-Of-Section-From-Start-Of-Bagrakot-To-Kafer-Km-13.00-To-Km-25.600-(pac>Nhidcl/pmu-kpg/nh-717a/ivb Rc/26
Balance Work Under Risk And Cost For Construction And Upgradation Of Existing Road To 2- Lane With Paved Shoulders Including Geometric Improvement Of Section From Start Of Bagrakot To Kafer Km 13.00 To Km 25.600 (pac
-Balance-Work-Under-Risk-And-Cost-For-Construction-And-Upgradation-Of-Existing-Road-To-2--Lane-With-Paved-Shoulders-Including-Geometric-Improvement-Of-Section-From-Start-Of-Bagrakot-To-Kafer-Km-13.00-To-Km-25.600-(pac>2026-07-06
-Balance-Work-Under-Risk-And-Cost-For-Construction-And-Upgradation-Of-Existing-Road-To-2--Lane-With-Paved-Shoulders-Including-Geometric-Improvement-Of-Section-From-Kafer-To-Lava-More-Km-40.00-To-Km-61.100-Of-Nh-717a-In>India -Balance-Work-Under-Risk-And-Cost-For-Construction-And-Upgradation-Of-Existing-Road-To-2--Lane-With-Paved-Shoulders-Including-Geometric-Improvement-Of-Section-From-Kafer-To-Lava-More-Km-40.00-To-Km-61.100-Of-Nh-717a-In>Nhidcl/pmu-kpg/nh-717a/va Rc/26
Balance Work Under Risk And Cost For Construction And Upgradation Of Existing Road To 2- Lane With Paved Shoulders Including Geometric Improvement Of Section From Kafer To Lava More Km 40.00 To Km 61.100 Of Nh-717a In
-Balance-Work-Under-Risk-And-Cost-For-Construction-And-Upgradation-Of-Existing-Road-To-2--Lane-With-Paved-Shoulders-Including-Geometric-Improvement-Of-Section-From-Kafer-To-Lava-More-Km-40.00-To-Km-61.100-Of-Nh-717a-In>2026-07-06
>India >Consultancy Services For A E During O And M Period Rail Cum Road Bridge Across River Ganga At Munger Ghat Near Munger From Km. 0.00 (km. 74.7 Of Nh 80) To Km. 9.394 (start Point Of Rail Cum Road Viaduct) And Km. 0.75 (end Point Of Rail Cum Road Via
>2026-07-06
India Tender Invited For Vendor Enlistment For Eddy Current Testing Of Condenser & Heat Exchanger Tubes In Turbine Area (category-i Enlistment). 2026-07-06
India Tender Invited For Vendor Enlistment For Online Leak Sealing In Turbine, Boiler & Other Areas Of Power Plant. (category-i Enlistment). 2026-07-06
Romania Purchase Of Multifunctional Biodiesel Equipment Within The Project Purchase Of Equipment To Increase Traffic Safety In Salaj County 2026-07-06
Whats app