Filter Search


Transportation


Location Summary Deadline
India Demolition Of Workshop-1 Building At I.t.i. Kubernagar, Ahmedabad. (2nd Attempt) 2026-03-06
-Construction-Of-Proposed-Bus-Terminus-At-Debra,-Paschim-Medinipur,-Phase-1>India -Construction-Of-Proposed-Bus-Terminus-At-Debra,-Paschim-Medinipur,-Phase-1>34/wbtidc/2025-26
Construction Of Proposed Bus Terminus At Debra, Paschim Medinipur, Phase 1
-Construction-Of-Proposed-Bus-Terminus-At-Debra,-Paschim-Medinipur,-Phase-1>2026-03-06
-Consultancy-Services-For-Dpr-Preparation,-Land-Acquisition,-Utility-Shifting-Work-For-Bypass-Road-Of-Shahera,-Dist.-Panchamahal.>India -Consultancy-Services-For-Dpr-Preparation,-Land-Acquisition,-Utility-Shifting-Work-For-Bypass-Road-Of-Shahera,-Dist.-Panchamahal.>Consultancy
Consultancy Services For Dpr Preparation, Land Acquisition, Utility Shifting Work For Bypass Road Of Shahera, Dist. Panchamahal.
-Consultancy-Services-For-Dpr-Preparation,-Land-Acquisition,-Utility-Shifting-Work-For-Bypass-Road-Of-Shahera,-Dist.-Panchamahal.>2026-03-06
India Providing Roads, Drains & Culverts At Edlapur Village Under Csr Scheme Under Fourth Stage. 2026-03-06
-Dhfws/dho/ckm/26-27-Outsource>India -Dhfws/dho/ckm/26-27-Outsource>Dhfws/dho/ckm/26-27 Outsource Drivers And Deos
Dhfws/dho/ckm/26-27 Outsource
-Dhfws/dho/ckm/26-27-Outsource>2026-03-06
India Management Of Social Media Project Publicity And Execution Of Digital Content Strategies. Social Media Accounts, Digital Content Strategy, Graphics Posts, Reels/shorts, Video Posts 2026-03-06
-Enrergent-Repair-To-Kalyanpur-Lndrapala-Durgapur-Road-From-Ch.1.00-Km-Ch.1.850km.by-Repearing-Potholes-And-Allied-Works-In-Strtches-Under-South-24-Parganas-Division,pwd-During-The-Year-2025-2026.>India -Enrergent-Repair-To-Kalyanpur-Lndrapala-Durgapur-Road-From-Ch.1.00-Km-Ch.1.850km.by-Repearing-Potholes-And-Allied-Works-In-Strtches-Under-South-24-Parganas-Division,pwd-During-The-Year-2025-2026.>Wbpwd/ae/bsd/enit-26/2025-2026
Enrergent Repair To Kalyanpur Lndrapala Durgapur Road From Ch.1.00 Km Ch.1.850km.by Repearing Potholes And Allied Works In Strtches Under South 24 Parganas Division,pwd During The Year 2025-2026.
-Enrergent-Repair-To-Kalyanpur-Lndrapala-Durgapur-Road-From-Ch.1.00-Km-Ch.1.850km.by-Repearing-Potholes-And-Allied-Works-In-Strtches-Under-South-24-Parganas-Division,pwd-During-The-Year-2025-2026.>2026-03-06
India Preventive And Break Down Maintenance Works On 220v Dc Batteries, Cleaning Of All Batteries And Battery Terminals, Conducting Load Test And Equalization Of Battery Charging Etc For Exide Make Batteries Of Units-1 And 2 Main Plant, Ahp And Switchyard As An 2026-03-06
India Removing, Cleaning, Testing And Refixing Of Solenoid Seal Kits, Pressure Switches, Limit Switches, Level Transmitters, Drain Valves, Multi Sensor Detectors, Manual Call Points, Hooters, Dome Valve Seals In Bop Area As And When Required During The Year-202 2026-03-06
India Testing, Calibration, Servicing Of Pneumatic Actuators, Motor Operated Valves Movs, Level Transmitters, Level Switches, Pressure And Dp Transmitters And Temperature Elements In Tg And Tg Auxiliaries Of Units-1and2 As And When Required During The Year 2026 2026-03-06
Whats app