Filter Search


Transportation


Location Summary Deadline
India Preparation Of Yard Plans By Modification Of Existing Plans And Approval Of The same From The Competent Authority Of Eastern Railway And Delivery In Cad Format and Pdf Format Using Drone/lidar And Dgps/ts, Unmanned Aerial System (uas) and Stereo Photogram 2026-05-07
India Comprehensive Drainage Study For Preparation Of Drainage Plan Of 31 Railway yards Under Sr.den/1/hwh 2026-05-07
India Manpur - Pt Deen Dyal Upadhyaya-tbr-1.96 Tkm, Tbr (turnout) - 5 Sets(1 In 12), tfr - 7.89 Tkm, And Cts(s/p) - 1.000 Tkm, Trr(p) - 11.445 Tkm & Tsr(p) - 2.600 tkm, & Causal Renewal Of Rails (primary) Trr(p) - 1.7 Tkm In Dos,aubr,rfj & gaya Each. 2026-05-07
India New Jalpaiguri - Darjeeling (sl/ng) - Trr(p) - 86.500 Tkm (by 50r Rail) Under jurisdiction Of Sr. Den/iii/kir. (total = 86.500 Km) 2026-05-07
India Design,modification,supply,installation,testing And Commissioning Of Existing hima Make Electronic Interlocking (ei) System At Bhuj For Tower Wagin Siding & naliya Station, In Connection With New Bg Line Between Naliya- Vayor, Naliya- jakhau Along With Mi 2026-05-07
India Trd Works In Connection With Interlocking Of Lc Gates In Bhavnagar Division having Atvu More Than 10,000 2026-05-07
India Pre And Post Tamping Track Measurement Survey Using Trimble Gedo Vorsys trolley System In The Jurisdiction Of Sse/pw/jsm Of Jodhpur Division 2026-05-07
India Surface Defect Detection By Eddy Current Array Testing Method On Lhb Wheels and Magnetic Particle Test & Dye Penetrate Test Of Various Components Of Bogie frame And Under Frame Component At Carriage Workshop, Nwr, Jodhpur (48 months) 2026-05-07
India Construction Of Toe Wall At Rh Side From Ch 17.300 To 17.630 (length-330 Mtr) And at Both Approaches Of Br. No.40 From Ch.18.950 To 19.250 (length 300 Mtr) between Kdri-avp Section Under The Jurisdiction Of Sse/p.way/raipur. 2026-05-07
India Indoor And Outdoor Signaling And Telecom Work In Connection With New Line In between Pok-rdra Via Bhairav Gufa-kailash Tehri (13.38 Km) Along With Alteration in Existing Kyosan Make Electronic Interlocking Of Pok And Rdra Station Of jodhpur Division, Nwr. 2026-05-07
Whats app