Filter Search


Transportation


Location Summary Deadline
India Construction Of Road From Patalmari Village Road To Manashri Bazar (length- 14.200 Including Bylane) In Chirang District Btc For The Year 2026-27. Tn_133_07 2026-04-02
India Contst. Of Road From Khaothong Chowk To Mebla Boro House Via Bijaypur Village From Ch.0.00 Km To Ch.2.00 Km (length-2.00 Km) With 2 Nos. Rcc Box Culvert Under Sopd In Btc Area In Barpather Vcdc, Chirang District For The Year 2025-26. Tn_133_08 2026-04-02
India Const. Of Chirang And Baksa District Connecting Road From Bogidwara Muslim Basti To Hakuwa River Via Abdaguri And Londonpara Village Road From Ch.0.00km To Ch.2.00km (length - 2.00km) With 1 No. Rcc Box Culvert Under Sopd In Btc Area In Hakuwa Vcdc, 2026-04-02
India 17-npp Sandila Me Wno10 Me Haneef Ke Makan Se Zaki Ke Makan Tak Cc Sadak Va Nali Nirman Karya 2026-04-02
India 20-npp Sandila Me Wno12 Me Ramkhelawan Ke Makan Ke Samne Hafiz Ji Ke Makan Tak Cc Sadak Va Nali Nirman Karya 2026-04-02
India 21-npp Sandila Me Wno 13 Me Vibbhin Sthano Par Nali Marammat,cc Marammmat, Nali Cross Puliya Marammat,interlocking Marammmat Va Khadanja Marammat Ka Karya 2026-04-02
India 32-npp Sandila Me Wno19 Mohalla Gulabadi Me Ateek Ke Makan Se Badrul Bedi Wale Ke Makan Tak Cc Sadak Va Nali Nirman Karya 2026-04-02
India 40-npp Sandila Me Wno24 Me Puttu Ke Makan Se Irshad Ali Ke Makan Tak Cc Sadak Va Nali Nirman Karya 2026-04-02
India 39-npp Sandila Me Wno22 Dr. Faisal Se Muneer Kharadi Ke Makan Tak Cc Sadak Va Nali Nirman Karya 2026-04-02
India 35-npp Sandila Me Wno20 Me Rajesh Ke Makan Se Mustaak Ke Makan Tak Cc Sadak Va Nali Nirman Karya 2026-04-02
Whats app