Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Set Of Insulating Rings (inner & Outer) For Tap Changer N-32 .#* Set Of Insulating Rings (inner & Outer) For Tap Changer N-32 As Per M/s River Engg. Part no. S-1218 & S-1219 Or M/s Anantashree Part No. G-1218 & G-1219 Or Rdso Drawing. No. Skel-4661 sheet 2026-06-22
South Africa Supply Of Summer Bulbs For Bryntirion Estate Goods & Services: 00235 2026-06-22
Japan Government Building Power (ac 3-phase 3-wire System, Supply Voltage 6,600 Volts) Scheduled Power Usage: 1,483,288kwh 2026-06-22
Japan Electricity Of Public Office Building (6,600v) Contract : 1,483,288kwh 2026-06-22
Italy Gpa 10732 Supply Of Electronic And Electromechanical Spare Parts Assembled To Design 2026-06-22
India Supply Of Sealed Maintenance-free Lead Acid Batteries With A Capacity Of 300 Ah. The Batteries Consist Of 52 Two-volt Cells Arranged In A Module, Complete With Necessary Connectors And Hardware, Housed In A Stainless Steel Battery Box Designed To Prevent 2026-06-22
India Blanking Plug For Lhb Coaches. Drawing No.- Rcf Drawing No. Lw71236, Alt. -nil. matl. & Spec. - As Per Drawing . .#* Blanking Plug For Lhb Coaches. Drawing No.- Rcf Drawing No. Lw71236, Alt. -nil. Matl. & spec. - As Per Drawing . [ Warranty Period: 30 Mon 2026-06-22
India Supply Of Twin Core Shielded Microphone .#* Supply Of Twin Core Shielded Microphone Cable (red & Black) Each Core Shall Be Of 23/26 Sw g Pvc Insulaed Copper Conductor In Over All Pvc Jacket Of Reputed Make Like Delton, Finolex, Asian Or Super ior, (as Per 2026-06-22
Finland Sillilän Daycare, Lieto 2026-06-22
United States Generation Control System And Sub-systems Upgrades - Stl 2026-06-22
Whats app