Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Tender Invited For Current Converter, 2 Channel, Input-4-20 Ma, Output-4-20 Ma For Prayas Engineering Limited Make Bel , Smps, Input- 90-270v Ac, Outpu-24v Dc, 2.5a, Output-for Prayas Engineering Ltd Make Belt Weigher Pane , Modweigh Belt Processor, Mk95, 2026-04-30
India Structured Cabling And Network Infrastructure For Rrec Internet Connection With 200 Lan Points 2026-04-30
India Sitc Of 10 Nos. Split Type Air Conditioner At Laboratory Room In Govt. Science College Distt. Sikar. 2026-04-30
India Sitc Of 10 Passenger Lift (01 No.) At State Level Veterinary Poly Clinic At Jaipur. 2026-04-30
-As-Per-Bid-Doc>India -As-Per-Bid-Doc>Construction Of Computer Lab At Kasturba Gandhi Balika Vidyalaya, Holagarh, District - Prayagraj (u.p)
As Per Bid Doc
-As-Per-Bid-Doc>2026-04-30
India Repair And Maintenance For External And Internal Electrification Work Of Nvda (isp) Kalmukhi Colony, Khargone Including Material, Labour Charges And Testing Etc. Complete Work. 2026-04-30
-Construction-Work-Of-C.-M.-Model-Composite-School-(pre---Primary-To-Class-12th)-In-Distt>India -Construction-Work-Of-C.-M.-Model-Composite-School-(pre---Primary-To-Class-12th)-In-Distt>Construction Work Of C M Model Composite School (pre - Primary To Class 12th) In Distt Kannauj (2nd Tahsil) (block Talgram Vill Sarayprayag, Tahsil- Chhibramau)
Construction Work Of C. M. Model Composite School (pre - Primary To Class 12th) In Distt
-Construction-Work-Of-C.-M.-Model-Composite-School-(pre---Primary-To-Class-12th)-In-Distt>2026-04-30
-Aug.-Of-By-Construction-Of-Boosting-Station,-Pumping-Machinery-And-Electric-Connection,-Scada-By-Installation-Of-Monitoring-And-Control-Devices,-Upgradation-Of-Existing-Bs,-Laying-Of-Distribution-Pipeline>India -Aug.-Of-By-Construction-Of-Boosting-Station,-Pumping-Machinery-And-Electric-Connection,-Scada-By-Installation-Of-Monitoring-And-Control-Devices,-Upgradation-Of-Existing-Bs,-Laying-Of-Distribution-Pipeline>Farrukh Nagar- Dnit For Lay...
Aug. Of By Construction Of Boosting Station, Pumping Machinery And Electric Connection, Scada By Installation Of Monitoring And Control Devices, Upgradation Of Existing Bs, Laying Of Distribution Pipeline
-Aug.-Of-By-Construction-Of-Boosting-Station,-Pumping-Machinery-And-Electric-Connection,-Scada-By-Installation-Of-Monitoring-And-Control-Devices,-Upgradation-Of-Existing-Bs,-Laying-Of-Distribution-Pipeline>2026-04-30
India Electrical Works, Construction Of 11/0.430kv, 3 Phase 100 Kva & 200 Kva Pole Mounted Distribution Sub Stations Due To Extension Of Load ( Load Enhancement In School )and To Provide Reliable And Steady Power Supply To The Boys Bodhjung School, Mara Chowmuh 2026-04-30
India Works For Execution Of Balance Civil, Mechanical, Electrical, Plumbing, Fire Fighting, Hvac, Signal & Telecommunication Works And All Other Related Finishing Works On Sub Contract Basis In Connection With redevelopment Of Udhna Station At Udhna Of Mumbai 2026-04-30
Whats app