Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
Germany Reconstruction Of Theaterhaus Stuttgart T1 - Stage Lighting T1 2026-05-05
India Request For Proposal - Selection Of Consultant For Preparation Of Comprehensive Architectural Drawings (with Coordination Of Mep Design), Need Based Rectification In Drawings / Supervision Work Etc. For A Narad Museum At District:- Nawada, Bihar Is To Be 2026-05-05
India Construction Work Of Depot Infrastructure Development In Phulwarisharif Of Patna District Under Pme-bus Service Scheme. 2026-05-05
Croatia Felling Of The Irrigation Ditch And The Distribution Lines Of The Overhead Pipelines For The Group Of The North Area 2026-05-05
Slovenia Supply Of Mv (rmu) Switchgear 24 Kv - Gwp <= 1 And Dry Air 2026-05-05
India Bracket For Empty Load Change Over Large For Box-n Wagon. .#* Bracket For Empty Load Change Over Large For Box-n Wagon To Irs Drg. No. W/bg-6348 Alt-2 . Matl. & Spec. As Per Drg. [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Toleranc 2026-05-05
Finland Emergency Generator 2026-05-05
India Temperature Indicating Lables For 3 Phase Traction Motor As Els/lgd Spec. no.c/els/lgd/spec/tm/temp.ind.label/0058. .#* Temperature Indicating Lables For 3 Phase Traction Motor As Els/lgd Spec. No.c/els/lg d/spec/tm/temp.ind.label/0058. [ Warranty Period: 2026-05-05
Poland The Subject Of The Order Is The Purchase And Installation Of Modern Switch Drives And Control Systems For Switches, As Well As The Modernization Of The Control System, Divided Into Tasks: Task I - Delivery, Connection, And Commissioning Of Tram Switch Dri 2026-05-05
Spain Execution Of The Works Of The Replacement Project And Execution Of Enclosures Between Pp.kk. 14/340 To 14/855; 34/218 To 36/021 And 53/490 To 53/870 Of Line 200 Madrid-chamartin-barcelona-estacio De Franca. Municipal Terms Of Madrid, Coslada, Alcala De He 2026-05-05
Whats app