Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
Japan ? Storage Battery Mse-2000 180each 2026-05-11
France Iac 12 Adaptation Work Deposit Sequedin Iac 121 Charging Infrastructures For Electric Buses And Ancillary Works (irbe, Vrd, Electricity) 2026-05-11
France Market For The Operation Of Collective Heating Installations, Production Of Hot Water For Sanitary Use, And Water Treatment Of The Heritage Of Lmh 2026-05-11
India 25161544 - Vcb Air Dryer Molecular Sieves Etc. .#* Vcb Air Dryer Molecular Sieves Of M/s. Aal Part No.4320010700 Or Schneider Electric Par t No. 5390090. Item To Be Supplied In Packs Of 4 Kg. [ Warranty Period: 30 Months After The Date Of D elivery ] [qua 2026-05-11
India Fitting Side Lamp Complete, Suitable For Use In Brake Van, Conforming To Rdso drawing No. Skel-4094 With Alteration-a. The Colour Convention Of Side Lamp Fitting is Outside Black Colour And Inside White Colour. The Fitting Shall Be Supplied Without lamp/b 2026-05-11
France Corrective Infiltration Work: Roofs Of Buildings Tc1 And Tc3 2026-05-11
France Corrective Infiltration Work: Roofs Of Buildings Tc1 And Tc3 2026-05-11
India Supply Of Foot Operating Switches Designed For Sanding, Adhering To Specific Engineering Drawings. The Switches Are Intended For Use In Electric Locomotives And Must Meet Specified Performance Standards. Foot Operating Switch 2026-05-11
Switzerland New Depot Construction Including Conversion Of Batterkinden Train Station (bkp 23 Interior Electrical Systems) 2026-05-11
Netherlands The Assignment Consists Of The Acquisition, Implementation, And Maintenance Of A Digital Depot For The Sustainable Storage Of Digital Information. The Contract Duration Is 4 Years With The Possibility Of 4 Extensions Of 1 Year Each. The Services Include A 2026-05-11
Whats app