Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Repair And Renovation Work And Construction Work Of New Ward At Phc Kawliyas (block Gulabpura) Distt. Bhilwara (dmft) 2026-04-25
India Flooring Work, Electric Work And Repair And Renovation Work Of Labour Room At Chc Asind (block Asind) Distt. Bhilwara (dmft) 2026-04-25
India Repair And Renovation Work Of Labour Room At Phc Hurda (block Gulabpura) Distt. Bhilwara.(dmft) 2026-04-25
India Repair And Renovation Work Of Labour Room At Phc Kawliyas (block Gulabpura) Distt. Bhilwara. (dmft) 2026-04-25
India Construction Work Of Jsy Ward At Phc Manpura (block Mandalgarh) Distt. Bhilwara (dmft) 2026-04-25
India Construction Of Mortuary At Sawaipur (block Kotri) District. – Bhilwara. (dmft) 2026-04-25
India Repair And Renovation Work Of Labour Room At Phc Aamli (block Sahara) Distt. Bhilwara. (dmft) 2026-04-25
India Repair And Renovation Work Of Labour Room And Construction Work Of Jsy Ward At Phc Mahendragarh (block Sahara) Distt. Bhilwara (dmft) 2026-04-25
India Tender Invited For 1. Unarmoured Cable-2 Pair 1.5 Mm2 , 2. Unarmoured Cable-3 Pair 1.5 Mm2 , 3. Unarmoured Cable-5pair 1.5 Mm2 , 4. Unarmoured Cable-10 Pair 1.5 Mm2 , 5. Unarmoured Cable-25 Pair 1.5 Mm2##quantity: 7500## 2026-04-25
India Construction Of Control Room Building With S/i System Sinking And Installation Of 200/165 Mm Dia Deep Boring At 33/11 Kv, Pss At Sarath Under Electric Supply Circle, Deoghar. Control Room Building, S/i System, Deep Boring 2026-04-25
Whats app