Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India 3 Kvar Metalized Polypropylene Gas Filled , Wavy Cut 3 Phase Self Healing Type capacitors, 480v, 50hz, 3.6a, Capacitor Should Have Discharge Resistor And Over pressure Disconnection Suitable For Capacitor Bank Of Lhb Ac Coach For Improving power Factor As 2026-04-23
India Carriage, Installation, Testing And Commissioning Of 1x62.5 Kva D.g Sets At Panchtarni In Connection With Sanjy 2026 2026-04-23
India The Project Involves The Procurement Of High Tension (ht) Meter Boxes, Which Are Essential For Electrical Distribution And Metering Purposes. Ht Meter Box 2026-04-23
India Scavenger Blower Duct For Traction Motor .#* Scavenger Blower Duct For Traction Motor Blower Of Wap-7 And Wag-9 Three P hase Locomotives As Per Clw Specifications No.clw/ms/3/099 Alt-7. [ Warranty Period: 30 Month s After The Date Of Delivery ] ] 2026-04-23
India Supply Of Switch Plate Assemblies Along With Mobile Sockets Designed For Lhb Eog Non-ac Coaches, Adhering To Specified Drawings And Standards. Switch Plate Assembly, Mobile Socket 2026-04-23
India Tender Invited For 15v Intrinsically Safe Signalling Bell##quantity: 70## 2026-04-23
India Tender Invited For Construction Of Futsal Court .#* Hiring Of Creative Agency##quantity: 1## 2026-04-23
India The Project Involves The Procurement Of Structural Materials Specifically For High Voltage Distribution Systems, Focusing On Pole Mounting Arrangements. Electrical Items 2026-04-23
India Supply Of Single-phase 11 Kv Hg Fuse Sets Equipped With Polymer Insulators For Electrical Distribution. Single Phase 11 Kv Hg Fuse Set, Polymer Insulator 2026-04-23
India Modified Tray Assembly For Stator .#* Modified Tray Assembly For Stator Conforming To Drawing No: 1tjf.096.141 [ War ranty Period: 30 Months After The Date Of Delivery ] ] 2026-04-23
Whats app