Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Empanelment Of Rate Contract Services For Diversion Of 132kv / 220kv / 400kv Transmission Lines In Nerts For A Period Of 2 Years. 2026-05-06
United States Phase B – Ps-a Penstock Replacement Project 2026-05-06
Spain Building Work Gives Alert And Comprehensive Maintenance 2026-05-06
France Renovation Work On The Tgbt Of The P10 Transformer Station And Installation Of A Gas Extinguishing System For The P10 Transformer Room On The La Ciotat Shipyard Site 2026-05-06
-Construc>India -Construc>Construction Of 7 Blocks Of R Type, 3 Blocks Of S Type, 2 Blocks Of T Type And 2 Blocks Of U Type Permanent Quarters Including Water Sump With Pipe , Stp And Internal Electrification Works For Officers And Staff Of Ustppstage I At Udangudi.
Construc
-Construc>2026-05-06
India The Tender Involves The Supply Of High Voltage Bushings That Meet Specific Technical Standards And Specifications. The Work Includes The Provision Of Materials Necessary For The Manufacturing And Delivery Of These Components. High Voltage Bushing 2026-05-06
India Digital Walkie-talkies Sets 5watt .#* Description: - Supply Of Tran?s Receiver, Vhf, Hand Held Digital Walkie-talkies Sets 5watt. Sy nthesized With 1. Minimum 2300mah Ni-mh Battery Pack, 2.configuration Vh-3 Band 136-174mhz, Full Ban d Along With One Spar 2026-05-06
India 9kva 750v / 415v / 190v Ac, 3-phase, Star-star-star, Dry Type, Air Cooled power Distribution Transformer For Lhb Type Coaches .#* 9 Kva 750v / 415v / 190v Ac, 3-phase, Star-star-star, Dry Type, Air Cooled Power distribution Transformer For Lhb Type Coache 2026-05-06
India Led Street Light 90w Luminaire As Per Enclosed Specification .#* Led Street Light 90w Luminaire As Per Enclosed Specification. [ Warranty Period: 60 M onths After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po 2026-05-06
India Bearing Shield De Side [end Shield]. .#* Bearing Shield De Side [end Shield] For Siemens Make Traction Motor Type It b-2022 Ota 03 As Per Siemens Handbook Part No. 4.10, Material No. A5e00305175 / A5e00305 175a. [ Warranty Period: 30 Months After The Date 2026-05-06
Whats app