Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
Luxembourg Luxembourg Station. West Head. Adaptation Work On Track Facilities. Year 2027. Phase 1. Application Phase. 2026-05-11
France Installation Work On A Photovoltaic Power Plant On The Roof And A Shade House At The Municipal And Metropolitan Technical Center Of The Sun 2026-05-11
France Energy Rehabilitation Work For The Metz Campus - Cper Project Nrjnov 2026-05-11
Austria Ion Therapy Center Medaustron Electrodes 2026-05-11
France Service Contract For The Rental And Installation Of Dynamic Display Solutions 2026-05-11
Romania Sectoral Electricity Purchase Contract 2026-05-11
Romania Outs 2026-05-11
India Poly Carbonate Clear Transparent Diffuser .#* Poly Carbonate Clear Transparent Diffuser For Compact Florescent Light Fitting Single (with 110 v Ac/dc Ballast ),made Out Of Electric Luminaire Grade Polycarbonate Sheet ,as Per Rcf Drg. No Cc76215 Al t-d Ite 2026-05-11
India Compact Fluorescent Light Fitting .#* Compact Fluorescent Light Fitting Double For Non Ac Coaches As Per Rcf Drg. No Cc-76423 Alt -c Without Cfl Tube (item-04 ), Ballast (item -05 )and Cover For (item- 22) [ Warranty Period: 30 Months A fter The Date Of D 2026-05-11
India Stator With Top And Bottom Cover .#* Stator With Top And Bottom Cover For Jyoti Make Arno As Per Clw Spec. No. Clw/es/a-1/ g. (item To Be Procured From Clw Approved Sources Only.) [ Warranty Period: 30 Months After The D ate Of Delivery ] ] 2026-05-11
Whats app