Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
Zimbabwe Fix And Supply Of Solar Systems 2026-05-15
India Ratchet Assembly For Coupling Socket Assembly. Suitable For Zs Iv couplers Of Lhb Eog Ac/non Ac/powercars .#* Ratchet Assembly For Coupling Socket Assembly. Suitable For Zs Iv Couplers of Lhb Eog Ac/non Ac/ Power Cars Conform To Rcf Spen. No. Edts-105, Re 2026-05-15
India Relay Over Voltage .#* Relay Over Voltage (q 20) For Tm To Clw Specification No.clw/es/r-28/alt-k. [ warranty Period: 30 Months After The Date Of Delivery ] ] 2026-05-15
India Hrc Fuse 16amps .#* Hrc Fuse 16amps/100v Dc Bottle Type Consists Of (1) Fuse Base. (2) Fuse Link. (3) Fuse carrier. (4) Gauge Piece. (5) Collar Ring To Clw Specfication Clw/es/f8 Alt-e & To Clw Drg.no. Clw/e s/sk-1/f8 Type A16. (authorised Dealers Should 2026-05-15
India Hrc Fuse 35amps/100v Dc Bottle Type .#* Hrc Fuse 35amps/100v Dc Bottle Type Consists Of (1) Fuse Base. (2) Fuse Link. (3) Fuse carrier. (4) Gauge Piece. (5) Collar Ring To Clw Specfication Clw/es/f8 Alt-e & To Clw Drg. No. Clw/es /sk- 1/f8 Type A-35 And C 2026-05-15
India Circuit Breaker Fuel Pump .#* Circuit Breaker Fuel Pump - Turbo - Lights - Governor Booster Pump-30amp To Emd Pa rt No 8458724 And To Dlw Part No : 18310229 For Wdp4/wdg4 Locos, Drg.no: Dlw Drg.no.8458724 A lt.ca [ Warranty Period: 30 Months After The Dat 2026-05-15
India Set Of Connectors For Loco Except Panel. .#* Set Of Connectors For Loco Except Panel For Wag-9 As Per Spec No. Clw/es/3/01 24_alt.o. Scope Of Supply Shall Be As Per Category No. N/150/0030 To N/235/003 Of Attached Annexure- A. [ Warranty Period: 30 Months 2026-05-15
India Construction Of 100 Bedded Hostel (under Pm-djgua) At Chargara (g Plus 1), Block- Nagawa, Distt - Sonbhadra. 2026-05-15
-Design-And-Construction-Of-Test,-Evaluation-And-Upskilling-Facility-For-Infrastructure-Research-Development-At-Pune>India -Design-And-Construction-Of-Test,-Evaluation-And-Upskilling-Facility-For-Infrastructure-Research-Development-At-Pune>Design And Construction Of Test, Evaluation And Upskilling Facility For Infrastructure Research Development At Pune
Design And Construction Of Test, Evaluation And Upskilling Facility For Infrastructure Research Development At Pune
-Design-And-Construction-Of-Test,-Evaluation-And-Upskilling-Facility-For-Infrastructure-Research-Development-At-Pune>2026-05-15
India Development Of 225 Kw Grid Connected Roof Top Solar Power Project 2026-05-15
Whats app