Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
Thailand Construction Work To Prevent Soil Erosion And Strengthen The Foundation Stability Of The 115 Kv Line Transmission System, Mae Taeng Power Station (egat) - Pai Power Station, Pole No. 31/5. 2026-05-12
Thailand Purchasing Secondary Supplies Meter Equipment Type, Quantity 1 Item, According To The Procurement Plan For Electricity Consumer Budget Work. Secondary Procurement Plan For 2026 By Electronic Bidding (e-bidding) 2026-05-12
Thailand Contract Labor To Install, Dismantle, Improve, Move, Exchange And Dismantle Low-voltage Meters, 1-phase And 3-phase Types That Are Not Shared With Each Other, Ct For The Year 2026. 2026-05-12
Thailand Hire A Contractor To Cut Down Trees Near The Electrical System Line In The Egat That Phanom Area For The First Time In 2026 By Selection Method. 2026-05-12
Thailand Purchase Of 1 Electrical Transformer Item For Work On Improving The Low Voltage Distribution System In 2025, No. 4/2025(68i031b336)bid.no.ega.??.(iq)136/2025 By Selection Method 2026-05-12
Thailand Buy Meter (e) Watthour, 2 Items, Number Kjop1-mt-014.1-2568 By Specific Method 2026-05-12
Thailand Outsiders Work On The Meter. Electricity Shutdown Work At Egat Pathum Thani For The Year 2026 2026-05-12
Thailand Hire Outside Contractors To Perform Meter Work. (power Interruption Work) Low Voltage Meter, 1 Phase And 3 Phase Type, Samut Songkhram Provincial Electricity Authority, Year 2026 By Electronic Bidding (e-bidding) By Selection Method. 2026-05-12
Thailand Bidding For Employment, Bidding For Hiring Outside Contractors To Perform Work Cut Back And Reconnect 1-phase And 3-phase Low-voltage Meters, 1-phase And 3-phase Low-voltage Meters That Are Not Combined With Ct. (both Normal Meters And Tou Meters) Overdue 2026-05-12
Thailand Hire A Construction Contractor To Expand The Area - Improve The Electrical Distribution System. (wage Only) Work Flora Banda Company Limited Job Number (wbs) C-68-h-nyics.0574 By Specific Method 2026-05-12
Whats app