Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
Mauritius Oab-td-2026-10411 (ifb 11014) - Procurement Of Drop-out Expulsion Fuse 22kv 2026-05-04
Mauritius Oab-td-2026-10225 (ifb 11078) - Procurement Of Lv 3x70mmsq Aluminium Insulated Twisted Cables 2026-05-04
Tunisia Selection Of A Technician For The Electrical Network In The District Court And The Real Estate Branch In Kairouan 2026-05-04
India Supply Of Solenoid Assemblies For Starter Motors Specifically Designed For Wdp4 Locomotives, Compatible With Delco Remy Part No: 1115567, Reil Part No: 95300256, And Lucas Tvs Part No: 26249327. The Assemblies Should Be Sourced From Approved Manufacturers 2026-05-04
India Conference Control Unit .#* Supply Of Conference Control Unit (digital Central Control Unit) Bosch Ccsdcurd Or Similar. [ warranty Period: 30 Months After The Date Of Delivery ] ] 2026-05-04
-Ward-No-1-Mein-Sthit-Gawan-Devat-Mandir-Mein-Prakash-Vyabastha-Hetu-2-Nag-Led-Semi-High-Mast-Light-Adhisthapan-Karya>India -Ward-No-1-Mein-Sthit-Gawan-Devat-Mandir-Mein-Prakash-Vyabastha-Hetu-2-Nag-Led-Semi-High-Mast-Light-Adhisthapan-Karya>Gawan Devat Mandir Mein Led Semi High Mast Light 2nag
Ward No 1 Mein Sthit Gawan Devat Mandir Mein Prakash Vyabastha Hetu 2 Nag Led Semi High Mast Light Adhisthapan Karya
-Ward-No-1-Mein-Sthit-Gawan-Devat-Mandir-Mein-Prakash-Vyabastha-Hetu-2-Nag-Led-Semi-High-Mast-Light-Adhisthapan-Karya>2026-05-04
-Construction-Of-New-Tad-Boys-Ashram-Hostel-(capacity-50)>India -Construction-Of-New-Tad-Boys-Ashram-Hostel-(capacity-50)>Construction Of New Tad Boys Ashram Hostel (capacity 50) At Ramgarh District Banswara
Construction Of New Tad Boys Ashram Hostel (capacity 50)
-Construction-Of-New-Tad-Boys-Ashram-Hostel-(capacity-50)>2026-05-04
-Construction-Of-New-Tad-Girls-Ashram-Hostel-(capacity-50)>India -Construction-Of-New-Tad-Girls-Ashram-Hostel-(capacity-50)>Construction Of New Tad Girls Ashram Hostel (capacity 50) At Dabok Mavli District Udaipur
Construction Of New Tad Girls Ashram Hostel (capacity 50)
-Construction-Of-New-Tad-Girls-Ashram-Hostel-(capacity-50)>2026-05-04
-Construction-Of-New-Tad-Boys-Ashram-Hostel-(capacity-50)>India -Construction-Of-New-Tad-Boys-Ashram-Hostel-(capacity-50)>Construction Of New Tad Boys Ashram Hostel (capacity 50) At Dheemri Jhadol District Udaipur
Construction Of New Tad Boys Ashram Hostel (capacity 50)
-Construction-Of-New-Tad-Boys-Ashram-Hostel-(capacity-50)>2026-05-04
France Renovation Of The Production And Distribution Installations For Hot Water (ecs) And Cold Water (ef), And The Renovation Of The Existing Boiler Room At The Residence Les Lilas In Besançon, On Behalf Of The Ccas Of Besançon. Hot Water Production Installatio 2026-05-04
Whats app