Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
South Africa Electrical Works For The Installation Of The Plc And Scada For A Period Of Two (02) Years At Matla Power Station 2026-04-29
-As>India -As>Sitc Of Necessary Hvac System Including Additional Supply Air And Exhaust Air System For Ivc Ventilators(existing And New) And Upgradation And Compatible Integrated Bms System Including Plc Field Controller And Devices At The Existing Operational
As
-As>2026-04-29
France Impression, Delivery, Installation And Removal Of Outdoor And Indoor Signage Communication Supports 2026-04-29
Germany 110 Kv Switchgear 2026-04-29
Germany Wittum Car Park - Photovoltaic System 2026-04-29
Malaysia Supply, Delivery, Installation, Testing And Commissioning Of 2 Units Earthing Transformer For Engkilili 275kv Substation And Kemantan 275kv Substation 2026-04-29
Malaysia Supply, Delivery, Install, Testing And Commissioning Of 2 Nos Ner At Tudan 275kv Substation And 2 Nos Of Ner At Kemena 275kv Substation 2026-04-29
India Rotary Switch 40a, 130 V Dc Etc. .#* Rotary Switch 40a, 130 V Dc, On/off Single Pole, Suitable For 110 V Tl System Conformin g To Icf Drg No. Icf.sk- 7-2-392 Alt.-"g" [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 % 2026-04-29
India Supply Of Various Components For The Automatic Plug Door System And Wsp System Of Vande Bharat And Lhb Coaches, Including Speed Sensor Cables With Connectors And Circuit Boards. Automatic Plug Door Spares, Circuit Board Mb 04b, Speed Sensor Cable With Con 2026-04-29
India Construction Of Vidyut Bhawan Annexe Phase-ii At Janpath, Jaipur (epc Mode On Turnkey Basis). 2026-04-29
Whats app