Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Comprehensive Annual Maintenance Contract Of Electric Industries Make Ips (12 nos.) Installed Over Lucknow Division Of Northern Railways For 36 (thirty-six) months 2026-04-14
India Reliability Improvement Of Signalling Installation I.c.w Improving Signal Visibility & minimizing The Rectification Time Of Signal Failure & In The Section Of sr.dste/co./lko Of Lucknow Division Of Northern Railways. 2026-04-14
India Complete Repair/rewinding Of Various Unit Exchange Items Of Demu Dpcs Of demu Shed, Mtd 2026-04-14
India Pad-centre Made Of Fiber-reinforced Polymers .#* Pad-centre Made Of Fiber-reinforced Polymers As Per Specification No 14856 Size 108cm X 12.8 Cm X 0.6 Cm (l X W X T) Suitable For Emd Make Rectifier Bank Assembly Of Hp Loco A s Per Kyn Drg No. Kyn/rect/pad 2026-04-14
India Special Repair To Lt Ug Cables From Att Sub Station To New Long Range At Nda Khadakwasla 2026-04-14
India Tender Invited For Led Garden Light (v2) (q2)##quantity: 40## 2026-04-14
India Est. For P/s To 01x25 Hp Ip(saw Mill) Conn. To M/s Alok Timber Mart Pro. Shir Alok Kumar Tiwari At Vill. Gadadih Under Gadadih D/c Of (o&m) Dn. Cspdcl Patan Bp.no. 1010349612 2026-04-14
India The Project Involves The Installation Of A 400 Kva High Tension (ht) Power Supply System For M/s. Hongli Engineers Llp, Specifically At The Designated Site On Ring Road No. 04 In Sarora. This Includes The Necessary Infrastructure To Connect To The 33 Kv S 2026-04-14
India Power Supply To 21 No Dlf Connection To Smt Shruti Das Gupta W/o Shri Arbind Kumar Mishra And 20 Others With 99 No Open Plots For 256 Kw Load At Village Chhatuna Unde Chakarbhatha D/c Of (o&m) Dn Bilaspur. 2026-04-14
India Estt. For Load Enhencement Addlitional Load 1500 Kva (over & Above 12 000 Kva) On 33 Kv Supply Of M/s. Shri Ram Navin Kumar & Sons Ispat (p) Ltd., Industrial Area, Phase-ii, Siltara Raipur (c.g.) Under (o&m) Dn. Siltara. (r55062250463) 2026-04-14
Whats app