Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India Installation Of Submersible Pump Stes, Electrical Pump Sets, Gi Pipe, Hdpe Pipeline, Electrical Cable For Uwss Bagru Under Sub Division Bagru 2026-04-10
India Replacement And Installation Of Submersible Pump Sets, Feeder Panel, Gi Lowering Pipe, Valve, Sub Cable In Existing Sources At Various Scheme Under Sub Dn. Sanganer 2026-04-10
India Providing And Installation Of Submersible Pump Sets, Panel Board And Replacement Of Old Polluted/damaged Pipeline Etc In Various Jjy/rwss Of Jen Section Renwal Majhi And Madhorajpura Under Block Madhorajpura Under Sub Dn. Chaksu 2026-04-10
India Construction And Commissioning Of 200mm Dia Tube Well And Submersible Pump Sets, Feeder Panel, Gi Pipe, Hdpe Pipeline And Submersible Cable At Various Rwss Block Chaksu Under Sub. Dn. Chaksu 2026-04-10
India B.f.b Steady Arm (32x31x3 Mm) Complete Assembly Etc. .#* B.f.b Steady Arm (32x31x3 Mm) Complete Assembly As Per Rdso Drawing no.eti/ohe/p/2390 Mod-b Conforming To Specification No. Ti/spc/ohe/fittings/ 0130 Rev-1. [ Warranty period: 30 Months After The Da 2026-04-10
India Current Transformer T20/t21/t22 For Internal Blowers 5va 15/a1mod. tcp5 Ratio 0.72/3kv Cl 0.5 Make Ste Italy Or Acec Part No. H9240 dn131040= 01 No.note: Dealers To Quote Alongwith Tender Specific authorisationletter Of Their Oem. .#* Current Transformer 2026-04-10
India Construction Of 1 Classroom At Gups In 1ffa (badp) Construction Of 2 Classrooms At Gups In 4ffa (badp) Construction Of Interlocking Road Gyan Singh House To Prabhjeet House 4ffa (sfc) Construction Of Interlocking Road At Gps In 19ff (ffc) 2026-04-10
Poland P - Execution Of Projects; Torun Branch; Torun 2026-04-10
Poland P - Execution Of Projects; Torun Branch; Torun 2026-04-10
Poland P - Execution Of Projects; Torun Branch; Torun 2026-04-10
Whats app