Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
Czech Republic The combined R&D and demonstration proposal EUCLID-POWER addresses Key Action 5.1: "Large scale electricity generation..." with Deliverable 5.1.2:" More efficient energy conversion processes". 2074-04-29
Germany GERMANY-Synergy packing approach for energy optimised building renovation 2075-05-04
Germany The project aims to demonstrate a new approach for renovation projects, the so-called synergy package approach, by renovating 600 dwellings in DE, NL, BE and DK. The synergy package approach is an inn 2075-05-04
United Kingdom UNITED KINGDOM-Design guide for building integrated Pv to minimise temperature and increase electrical output 2076-04-26
United Kingdom Minimizing the temperature of Building Integrated PV to increase electrical output. It is estimated that an average BIPV cell operates at a temperature of up to 10 degrees C above that which could be 2076-04-26
France The overall objective of this project aims at reducing time and cost for exploration appraisal of hydrocarbon reservoirs by providing an accurate image of the borehole for wells drilled with non condu 2076-10-30
Portugal PORTUGAL-Trigeneration and integrated energy services in South of Europe and Brazil - target action F 2076-12-19
Portugal The project will demonstrate an innovative integration of three technologies: microturbine, hot water fired absorption chillier and ice storage thermal system and aims to demonstrate the main benefits 2076-12-19
Austria One key objective of the project proposed is the demonstration of an innovative small-scale biomass CHP technology based on an ORC process with a nominal electric capacity of 1,000kW. The second key a 2078-12-14
United Kingdom UNITED KINGDOM-Technology impacts on load profiling for tariff development end deregulated European electricity markets 2079-01-12
Whats app