Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
Austria AUSTRIA-Pushing a last cost integration of green electricity into the European grid 2062-12-17
Germany The Project of Enhanced production of methane from anaerobic digestion with pre-processed solid waste for renewable energy. Project cost: 1087386 EURO Project Funding: 543550 EURO Duration: 7 2062-12-17
Austria The core objective of this proposal is to enhance the proportion of electricity from renewable energy sources (RES-E) in the EU by applying a least-cost approach. A derived objective is to consider th 2062-12-17
Portugal PORTUGAL-Renewable energy solutions for islands target action A 2062-12-22
Portugal The main objective of the project is to contribute to the market penetration of new energy systems combining fuel cells (FC), renewable energy sources (RES) and hydrogen (H2 ) in islands and remote re 2062-12-22
United States United States: Geothermal Low Temp 2062-12-31
United Kingdom The primary objective of the proposed Accompanying Measure is to quantify the scope for EU industry to cooperate with their Chinese counterparts for the provision of technology and services to improve 2063-01-02
Netherlands The overall objective of this project is to reduce the risks of ship collisions with offshore wind farms and thereby to reduce the costs associated with these risks and to accelerate acceptance of con 2063-01-19
Portugal The Project of Energy peak-shaving system for elevators. Project cost: 1047350 EURO Project Funding: 523675 EURO Duration: 720 months Start date: 2003-02-25 End date: 2063-02-24 2063-02-24
Norway The objective is to develop European technology that can dramatically contribute to increase recovery rates from hydrocarbon reservoirs. The technology is a smart well completion system, which can be 2063-03-06
Whats app