Filter Search


Transportation


Location Summary Deadline
India Supply Of Self Adhesive Insulation Material #*. Self Adhesive Insulation Material Size 5x1250x1250 Mm As Per Drg.no. Mdts-116revision 06, Packing Instruction - Pi042 Ver. 01. [ Warranty Period: 30 Months After The Date Of Delivery ]self Adhesive Insulatio 2026-03-31
India Supply Of Coach Set Of End Part Ac Emu #*. One Coach Set Of End Part (alarm End And Non Alarm End) For 3 Phase Ac Emu Trailer Coach ( For Mrvc Phase-ii) To Drg.no. Icf/mrvc/c/bt-1-1-004, Col-i = 1 No, Alt " L " And Icf/mrvc/c/bt-1-1-003, Col.i = 1 No, Alt 2026-03-31
India Supply Of Coach Set Of End Part Ac Emu #*. One Coach Set Of End Part (alarm End And Non Alarm End) For 3 Phase Ac Emu Trailer Coach ( For Mrvc Phase-ii) To Drg.no. Icf/mrvc/c/bt-1-1-004, Col-i = 1 No, Alt " L " And Icf/mrvc/c/bt-1-1-003, Col.i = 1 No, Alt 2026-03-31
India Supply Of Under Frame Complete For Lslrd #*. Underframe Complete For Lslrd Coaches To Drg No 74111001 Col 1, Alt-'c'. The Schedule Of Technical Requirement As Per Icf/md/specn.147, Issue Status-01, Rev-02with Amendment No-01. Special Condition : Packing C 2026-03-31
India Supply Of One Coach Set Of 3mm Lavatory Side Wall For Lhb Lgs/eog & Lscn/eog Coaches To Drg. No. 67014010, Col-i, Alt "b" - 1 No, 67014011, Col-i, Alt "c" - 1 No, 58214042, Col-i, Alt"b" - 1 No, 58214044, Col-i, Alt "b" - 1 No. The Firm Shall Fulfill The 2026-03-31
India Supply Of Centering Disc Kit(prim) For Fiat Bogie #*. Centring Disc For Primary Suspension 1)centering Disc To Drg.no.aaa01023, Alt "c" - 8 Nos Inspection Of Painting By Icf Based On Firm's Wtc. 2)centering Disc To Drg.no.aaa01026, Alt "c" - 8 Nos Inspect 2026-03-31
India Supply Of Centering Disc Kit(prim) For Fiat Bogie #*. Centring Disc For Primary Suspension 1)centering Disc To Drg.no.aaa01023, Alt "c" - 8 Nos Inspection Of Painting By Icf Based On Firm's Wtc. 2)centering Disc To Drg.no.aaa01026, Alt "c" - 8 Nos Inspect 2026-03-31
India Supply Of S&i Air Brake Eqpt Detc/us Sk-102342 #*. Supply & Installation Of Air Brake Equipment For Detc/us(with Electric Transmission)coaches To Schematic Drg No. (231) Detc/us 3-5-005, Alt-c And To Schedule No.icf/sk-10-2-342,issue Status-01,rev.04.... 2026-03-31
India Supply Of Set Of Panels To Edts-355 #*. Set Of Panels To Edts-355, Rev-1. Amdt-1,2 & 6 With Icf Annexure No.1, 2 & 3. Note: 1. In Icf Annexure -3 A)drg. No. Icf/sk3-7-2-047 Shall Be Read As Icf/sk3-7-2-047 Alt-f Or Latest. B)the 4 Nos.mpcb In Bom At Sl.no 2026-03-31
India Supply Of Set Of Panels To Edts-355 #*. Set Of Panels To Edts-355, Rev-1. Amdt-1,2 & 6 With Icf Annexure No.1, 2 & 3. Note: 1. In Icf Annexure -3 A)drg. No. Icf/sk3-7-2-047 Shall Be Read As Icf/sk3-7-2-047 Alt-f Or Latest. B)the 4 Nos.mpcb In Bom At Sl.no 2026-03-31
Whats app