Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
India 29741075-igbt Based 3- Phase Drive Propulsion Equipments Along With (1) Physical Medium I.e. Esd/emd/ofg For Multi Functional Vehicle Bus (mvb) As Per Iec-61375. (2) Terminal Bracket, Bus Bar Link And 2029-12-31
India 29741075-igbt Based 3- Phase Drive Propulsion Equipments Along With (1) Physical Medium I.e. Esd/emd/ofg For Multi Functional Vehicle Bus (mvb) As Per Iec-61375. (2) Terminal Bracket, Bus Bar Link And 2029-12-31
India 29741075-igbt Based 3- Phase Drive Propulsion Equipments Along With (1) Physical Medium I.e. Esd/emd/ofg For Multi Functional Vehicle Bus (mvb) As Per Iec-61375. (2) Terminal Bracket, Bus Bar Link And 2029-12-31
India 29741075-igbt Based 3- Phase Drive Propulsion Equipments Along With (1) Physical Medium I.e. Esd/emd/ofg For Multi Functional Vehicle Bus (mvb) As Per Iec-61375. (2) Terminal Bracket, Bus Bar Link And 2029-12-31
United Kingdom Fleet Replacement Programme – Network Management Electric Compact Panel Van 2029-12-31
Sweden Contract Awarded For Reform Audits Q38/q39 And Q48 contract Period Start: 8/29/2025 estimated Value: .reform Audits Q38/q39 And Q48 2029-12-31
Sweden Contract Awarded For Installation Of Ip-based Emergency Disconnection In Central Sweden turnkey Contract Regarding The Introduction Of Ip Emergency Disconnection In Facilities For Power Supply To Railways In Central Sweden. Includes I.a. Planning, Instal 2029-12-31
India Design, Supply, Installation, Testing And Commissioning Of Solar Highmast Under Sd Budget Be 2024-25 At Vstps 2030-01-06
United States The Mk 150 Mod 0 4.0 Second Delay Detonator, And The Mk 164 Mod 0 Non Electric Dual Detonator. 2030-01-08
India Climate Chamber For Battery/cell Testing With Amc 2030-01-19
Whats app