Filter Search


Energy,-Power-and-Electrical


Location Summary Deadline
Australia Contract Awarded For Switch To Social Work Curriculum Delivery - Cp Scholarship Program this Forms Part Of Implementing A 2021-22 Victorian State Budget Commitment Of $13.5 Million Over Four Years For An Intake Of 56 Participants To Undertake A Master In 2026-10-31
India Supply Of Electrical Signal Exchange System. #*. Electrical Signal Exchange System For Three Phase Locomotive (each System Consists Of(i) Two Sets Of Led Lights (ii) Operating Panel/switches For Loco Pilot And Assistant Loco Pilot Separately And (iii) Har 2026-10-31
India Supply Of Electrical Signal Exchange System. #*. Electrical Signal Exchange System For Three Phase Locomotive (each System Consists Of(i) Two Sets Of Led Lights (ii) Operating Panel/switches For Loco Pilot And Assistant Loco Pilot Separately And (iii) Har 2026-10-31
India Thichur Sub Centr Maintenance Works At Varavoor Gp ( Project No 98/26 ) #*. Compound Wall Works 2026-10-31
India Supply Of 4603n018: Porcelain 9 Tonne Insulator (ri 6020-1) (1050mm Cd) As Per Rdso Spec No. Ti/spc/ Ohe/ Ins/0071. Accepted Make/ Brand: Modern Insulators Limited. (mil) 2026-10-31
India Cable Flexible Single Core 2.5 Sq.mm .#* Cable Flexible Single Core 2.5 Sq.mm (50 X 0.25mm) Tinned Copper Conductor with Elastomeric Insulated & Sheathed 750 V Grade As Per Rdso Specn. E.14/01 Rev-ii-1993 (part-i) With Amendment No.4 Of Sep 2003 Or Latest 2026-10-31
India Supply Of 33633587: Centralized Procurement Of Cpcb-iv Compliant 500kva (336kw), 750v, 3 Phase Diesel Alternator Sets On Sitc(supply, Installation, Testing And Commissioning) Basis For Lhb Power Car (without Power And Co 2026-10-31
India Supply Of 421604940066: Shell Modifications Along With Material And Manpower For Installation Of Cpcb-iv Compliant Da Sets As Per Rcf Loa Attached And Rcf Cai Document No. Ed/cai/040, Dated 22.10.2024. 2026-10-31
United Kingdom Pdps 2026-11-01
United Kingdom Pdps 2026-11-01
Whats app