Filter Search


Asia-Pacific


Location Summary Deadline
India Set Of Cylindrical Roller Bearing Consis [set Of Cylindrical Roller Bearing Consisting of One Bearing Each Of Part No.: Ud62.2618p + Ud62.2610p, Sub. Part No.: nj2224e.m1.c4 + Njp2224e.m1.c4, Cage Material: Brass, Clearance: C4, For Uni, duo Machines. Par 2026-04-30
India Different Maintenance Work Between Ward No. 10 To 18 For Financial Year 2026-27 2026-04-30
India P/l New Strom Water Line And Repairing Catchpit Work At Different Roads Of Sabarmati And Motera Area In Sabarmati Ward In West Zone. 2026-04-30
India Work For Cleaning Of Tank, Repairing And Replacement Of Old Fins Of Cutting Bed Of 02 Nos. Underwater Plasma machine, 01 No. Cnc Pro Arc Oxy Acetylene, 01 No. Cnc Pro Arc Oxy Profile And 01 No. Cnc Pro Arc Air Plasma cutting Machine Installed In Bogie Sho 2026-04-30
India Electrical Work In Connection With (i) Improvement To Damaged Flooring, Walls, rooms, Halls, Staircase Of Accounts Building Annexe-ii At Baroda House New Delhi ii) Improvement Of General Admin Section Of G Branch, Gms Conference Hall At main Building At G 2026-04-30
India Choudapur Bus Stand Genrall Stall-02 Built 100.00 Sqrt End Date 30.09.26 2026-04-30
Australia The Audit Services To Be Provided By The Contractor To The Anao Will Be In Respect Of The Audit Of The Financial Statements Of The Commonwealth Entities For The 2026–27, 2027–28 And 2028–29 Financial Years (in Addition To Any Other Periods For Which This 2026-04-30
India Tender Invited For Monthly Basis Cab & Taxi Hiring Services - Suv; 2000km720hrs; Local 24*7##quantity: 1## 2026-04-30
India M.s. Plain Punched Washer .#* M.s. Plain Punched Washer Size. 12 Mm. As Per Specn. Is: 2016/1967 [ Warranty Pe riod: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation permitted: Ma 2026-04-30
-Construction-Work-In-Npp-Loni-Work-No-3>India -Construction-Work-In-Npp-Loni-Work-No-3>Construction Work
Construction Work In Npp Loni Work No 3
-Construction-Work-In-Npp-Loni-Work-No-3>2026-04-30
Whats app