Filter Search


Asia-Pacific


Location Summary Deadline
India Schunk Pantograph (wbl 22.03) Spare Parts .#* Schunk Pantograph (wbl 22.03) Spare Parts As Per Rdso Specification No. Rdso/pe/spec/emu/0196-2019(latest) Along With Latest Annexure A nd Addendum/corrigendum To M/s Schunk Part Nos For 18 Month Schedule Suit 2026-04-30
India Ward-17, Sevanagar Mengli No. 10 From Babli To Shivkumar And Anitawali Gali And From Manish Yadav To Jain Bahadur, Construction Work Of Cc And Drain. 2026-04-30
India Clearance Of Weed, Jalla, Deela, Sarkanda,jungle, Butti,dhora, Silts Etc Manually From Inner Section Of Lined Channel ( Bhaini Disty. ) (medium Growth) And De-silt Clearance Rd 20000 To 24000 And 34000 To 39000 And 59000 To 63180 Of Bhaini Disty Of M 2026-04-30
India Auction Sale Of Lot No - 1 Lot Name - Electronic Analytical Balance Product Type - Plant/machineries Category - Tools & Equipments, Lot No - 2 Lot Name - List Of Surplus, Obsolete And Unserviceable Stores For Disposal Product Type - Electrical Items Categ 2026-04-30
India The Project Involves The Repair And Overhauling Of Cnc Lathe Machines, Focusing On Restoring Functionality And Performance. Services Will Be Provided At Both The Buyer''''s Premises And The Service Provider''''s Location. Repair Of Cnc Lathe Machine 2026-04-30
Russian Federation Supply Of Paints And Varnishes For The Needs Of Jsc Giproniigaz 2026-04-30
-Balance-Work-Of-Strengthening-Of-Ukhrul-To-Choithar-Section-Of-Nh-202-From-Existing-Km-50.520-To-Km-59.236-(design-Chainage-Km-45.600-To-Km-54.212)-In-The-State-Of-Manipur-On-Epc-Mode-Under-Nh(o)-ne-(package>India -Balance-Work-Of-Strengthening-Of-Ukhrul-To-Choithar-Section-Of-Nh-202-From-Existing-Km-50.520-To-Km-59.236-(design-Chainage-Km-45.600-To-Km-54.212)-In-The-State-Of-Manipur-On-Epc-Mode-Under-Nh(o)-ne-(package>Nhidcl/manipur/ukhrul- Choithar/pkg4/2024
Balance Work Of Strengthening Of Ukhrul To Choithar Section Of Nh-202 From Existing Km 50.520 To Km 59.236 (design Chainage Km 45.600 To Km 54.212) In The State Of Manipur On Epc Mode Under Nh(o)-ne (package
-Balance-Work-Of-Strengthening-Of-Ukhrul-To-Choithar-Section-Of-Nh-202-From-Existing-Km-50.520-To-Km-59.236-(design-Chainage-Km-45.600-To-Km-54.212)-In-The-State-Of-Manipur-On-Epc-Mode-Under-Nh(o)-ne-(package>2026-04-30
Mongolia Aquatic Center Pool Repair Work 2026-04-30
India 19 - Supply Of Various Construction Materials And Equipments Under Mnrega For Financial Year 2026-27 In Gp Rohaniya Ps Pipalkhut District Pratapgarh (raj). 2026-04-30
India The Tender Involves The Supply Of Hematology Control Products, Specifically M-51 Hematology Control Low, High, And Normal Variants, Intended For Use In Medical Settings. M-51 Heamtology Control Low, M-51 Heamtology Control High, M-51 Heamtology Control No 2026-04-30
Whats app