Filter Search


Asia-Pacific


Location Summary Deadline
India Sitel Primary Cells Dry (6-i Type) For Railway S & T Installations Etc. .#* Sitel Primary Cells Dry (6-i Type) For Railway S & T Installations As Per Rdso Spec. No: irs:s-95/96 With Amd.1 Or Latest Amendment Up To Date Of Tender Opening. [ Warranty Period 2026-04-09
India Construction Of New Mamlatdar Office Building At Anklav, Dist.-anand 2026-04-09
India High Tensile Tight Loco Transition Center Buffer Coupler .#* High Tensile Tight Loco Transition Center Buffer Coupler Suitable To Fit Pocket-sized For Wap- 7 Electric Locomotive As Per Rdso Specn.no. Mp.0.41.00.05. (rev 03) And Rdso Approved Latest Detail 2026-04-09
India "stainless Steel Sheet Trimmed Edge To Size 2500 X 1250 X 1.7 Mm Conforming to Rdso Specification No. C-k201 With Amendment No. 1 Of Feb 2014, Grade- X2 cr Ni N 187 (301), 2b Finish." .#* "stainless Steel Sheet Trimmed Edge To Size 2500 X 1250 X 1.7 Mm Co 2026-04-09
India Set Of Special Type Manual Gauges For Visual Inspection Of Lhb Wheels In Machining & Testing Area Of Fwp. Set List As Per Annexure-b. .#* Set Of Special Type Manual Gauges For Visual Inspection Of Lhb Wheels In Machining & Testin g Area Of Fwp. Set List A 2026-04-09
India Supply, Installation & Commissioning Of Lock Bolt Machine .#* Supply, Installation & Commissioning Of Lock Bolt Machine With Power Pack And Tools Size: 1/2", 3/4",5/8", 7/8" As Per Attached A nnexure-a. [ Warranty Period: 30 Months After The Date Of Deliv 2026-04-09
India Secondary Vertical Damper For Non Ac Coaches With Fiat Bogie. Drawing No.:- rdso/cg/drg/21018, Alt-3 Or Latest . Mat. Spec.:-rdso/cg-18005, Rev- 02 With latest Revision & Amendments .#* Secondary Vertical Damper For Non Ac Coaches With Fiat Bogie. Drawing 2026-04-09
-Power-Purchase-Agreement-(ppa)-For-2.0mwp-Grid-Connected-Roof-Top/ground-Solar-Pv-Power-System-Shall-Be-Increased-Up-To-3.5mwp-As-Per-Requirement-For-25-Years-Including-Design,-Manufacture,-Setc-Warranty,-Operation-And-M>India -Power-Purchase-Agreement-(ppa)-For-2.0mwp-Grid-Connected-Roof-Top/ground-Solar-Pv-Power-System-Shall-Be-Increased-Up-To-3.5mwp-As-Per-Requirement-For-25-Years-Including-Design,-Manufacture,-Setc-Warranty,-Operation-And-M>Tender/2026/solarplant 2 Mwp
Power Purchase Agreement (ppa) For 2.0mwp Grid Connected Roof Top/ground Solar Pv Power System Shall Be Increased Up To 3.5mwp As Per Requirement For 25 Years Including Design, Manufacture, Setc Warranty, Operation And M
-Power-Purchase-Agreement-(ppa)-For-2.0mwp-Grid-Connected-Roof-Top/ground-Solar-Pv-Power-System-Shall-Be-Increased-Up-To-3.5mwp-As-Per-Requirement-For-25-Years-Including-Design,-Manufacture,-Setc-Warranty,-Operation-And-M>2026-04-09
India Stiffener Plate Along With Fasteners For Front Carrier Plate Of Cbc .#* Stiffener Plate Along With Fasteners For Front Carrier Plate Of Cbc As Per Rds o Drawing No. Rdso/cg/drg/24034, Alt.2 Item Nos 1 To 5. Note:-1. Stiffener Plates Shall Be As per Is:388 2026-04-09
India Supply, Installation And Commissioning Of High Capacity Dead End Energy Absorption System (hydraulic Bufferstop) At Coaching Depot, Hyderabad .#* Supply, Installation And Commissioning Of High Capacity Dead End Energy Absorption System (hydraulic bufferst 2026-04-09
Whats app