Filter Search


Asia-Pacific


Location Summary Deadline
India Hubballi Division: Proposed Construction Of Changing Room & Separate Wash Room (7-nos) For Ladies Station Masters And Points-women At Gadag, Hospet, munirabad, Ballari, Obulapuram,kudathini And Raydurg Under Sr.den/east/ubl jurisdiction. (maintainence Per 2026-06-05
India Hubballi Division: Rebuilding Of Existing Bridge No.45[km 82/4-5] In Gadag- hosapete (gdg-hpt) Section By Box Pushing Method In Aden Gadag Sub Division. (maintenance Period:12 Months) 2026-06-05
India Hubballi Division : Gadag - Hospet (gdg-hpt) Section: Construction Of Limited height Subway In Lieu Of Lc No. 36 Km 61/900- 62/o In Between Gdg - Kgx (gadag-kanginhal) Station.( Maintenance Period-12 Months) 2026-06-05
India Hubballi Division : Augmentation Of Running Room At Toranagallu (tngl) (80 beds). (maintenance Period-36 Months) 2026-06-05
India Hyderabad Division: 1) Proposed Improvements To Corrosion Shop Bay-7 (c-11& C- 12 Lines) At Cws Lgd 2) Corrosion Shop Line 1 & 2 Sheds (for Electrical Department ) At Carriage Work Shop/lgd 3) Proposed Shed For Accommodating Bogie Washing plant Adjacent T 2026-06-05
India Hyderabad Division: Proposed Construction Of Sewage Treatment Plant (150 Kld) at Diesel Loco Shed/mly 2026-06-05
India Hubballi Division : Gadag - Hospet (gdg-hpt) Section: Construction Of Limited height Subway In Lieu Of Lc No. 36 Km 61/900- 62/o In Between Gdg - Kgx (gadag-kanginhal) Station.( Maintenance Period-12 Months) 2026-06-05
Singapore Contract For Transformer Oil Testing Using Dissolved Gas Analysis (dga) And Oil Quality Test (oqt) For Insulating Oil Of Oil-filled Transformers For Senoko Energy Pte Ltd 2026-06-05
Malaysia Annual Contract For The Overhead Line Vegetation Clearing At Rural Hybrid Power Stations, Bintulu Area 2026-06-05
Philippines Procurement Of In-organic Fertilizer Of Sogod Abuno Program (sap) 2026-06-05
Whats app