Filter Search


Asia-Pacific


Location Summary Deadline
Malaysia Service And Maintenance Of Air Conditioning System In Miri Substations 2026-02-11
Philippines Improvement Of Talakag Landmark, Lirongan 2026-02-11
Philippines Isidros Isidro 2026-02-11
India Ckt. Breaker Without Auxiliary Contacts (type - 8) .#* Ckt. Breaker Without Auxiliary Contacts (type - 8) To Spec./drg. No.clw/es/3/0 050/c [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2026-02-11
India Southern Railway: Phased Array Ultrasonic Testing (paut) Of Fb Welded Joints executed By Mobile Fb Plants At Site Using Rdso Verified Paut Weld Tester In chennai, Salem, Tiruchchirappalli And Madurai Divisions Of Southern Railway For A period Of Two Year 2026-02-11
India Friction Snubber Assembly With Top And Bottom Rubber Washer Drawing No. (1) Cg- k4014 Alt.-nil Or Latest, Item No. 1 (2) Cg-k4015 Alt-nil Or Latest, Item No. 3 To 5. rdso Specification No. C-k401(rev-1) .#* Friction Snubber Assembly With Top And Bottom Ru 2026-02-11
India Multi Function Machine .#* Supply, Installation Of Inkjet Colour Multifunction Printer, Make: Epson L3260 Or Similar. [ Wa rranty Period: 12 Months After The Date Of Delivery ] ] 2026-02-11
India Ceramic Repair Kit (kit Of Conditioner With Primer) .#* Ceramic Repair Kit (kit Of Conditioner With Primer) [ai(2025-26), Item Code-no: S64055, Sl N o.2115] ] 2026-02-11
India Ss Pipe Clamp .#* Half Clamp As Per Drawing No. Aab63593,alt-nil [ Warranty Period: 30 Months After The Dat e Of Delivery ] ] 2026-02-11
India Engineering Item .#* Gang /worksite Remote Control Hooter As Per Rdso Specification (no. Tm/sm/31 8 Dated 21.05.2008) (first Revision Of 2021) Or Latest [ Warranty Period: 30 Months After The Date Of delivery ] ] 2026-02-11
Whats app