Filter Search


Asia-Pacific


Location Summary Deadline
India Supply, Installation, Testing, And Commissioning Of Maintenance-free Vrla (valve regulated Lead Acid) Hot-swappable Battery Modules For Eaton Make Ups systems On A Buy-back Basis For Cris Offices. 2026-04-07
India Rubber Pad For Primary Suspension For Fiat Ir Bogie Of Lhb Coaches to Rcf.drg.no.lw.01101, Alt.b. .#* Rubber Pad For Primary Suspension For Fiat Ir Bogie Of Lhb Coaches To Rcf.d rg.no.lw.01101, Alt.b. [ Warranty Period: 30 Months After The Date Of Deliver 2026-04-07
India Vibration Shaft .#* Bearing Flange, Part No: 2e22.11, Rdso Drawing No: Tm/0408, Material Specification: Tm/hm /6/140. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2026-04-07
India Tie Rod To Rdso Drg.no. Wd-09034-s-10, Alt.- 10 Or Latest, Item No.-19. Material and Specification : As Per Drawing & Conforming To Rdsos Spec. No. Wd-02- boxnhl 2011. .#* Tie Rod To Rdso Drg.no. Wd-09034-s-10, Alt.- 10 Or Latest, Item No.-19. Material An 2026-04-07
India Snap Action Micro Switch 240 V Ac, 8 Amp Contact Rating, Having M3 screw Type Connection. Schaltbau, Type No. S800 A Or M/s. Ftrtipl Part no. 003110500 Suitable For Faiveley Make Brake Controller For Wag- 9/wap-7 Locomotives. .#* Snap Action Micro Switch 2026-04-07
India Rubber Packing 5x150mm In Running Length Of 4 Mtrs. .#* Rubber Packing 5x150mm In Running Length Of 4 Mtrs As Per Mdts-49380. Packi ng Instruction: As Per Standard Packing. It Should Be Ensured That Item Should Not Rub Du ring Transportation. The Item Sho 2026-04-07
India Set Of Male Female Mu Coupler .#* Set Of Male Female Mu Coupler Complete ( B,c,d) As Per Clw Spec. No.clw/es/c-8/alt-j. Eac h Set Consisting Of 5 Items 120 Nos As Follows (1) Mu Coupler Male And Female Complete Type B, Qty.- 1 No. (2) Mu Coupler Male And 2026-04-07
India Air Compressor Elgi Make Rr 15070pkg With Dryer Tpl No. S07107 For Sparmv wardha Of Ngp Division .#* Air Compressor Elgi Make Rr 15070pkg With Dryer Tpl No. S07107 For Sparmv Wardha O f Ngp Division [ Warranty Period: 30 Months After The Date Of Delivery 2026-04-07
India Supplying And Stacking On Railway Ground 65mm Machine Crushed Stone Ballast as Per Latest Specification Of Rdso/lko Of Feb-2023 With Latest Amendments including Royalty And Fees Etc And Loading The Same Into Railway Hoppers/wagons etc As Directed By Aden 2026-04-07
India Integrated Test Bench For Air Spring Suspension Control Equipment ( leveling Valve And Duplex Check Valve) As Per Specification Attached. .#* Integrated Test Bench For Air Spring Suspension Control Equipment ( Leveling V alve And Duplex Check Valve) As Pe 2026-04-07
Whats app