Filter Search


Asia-Pacific


Location Summary Deadline
India Tender Invited For Integrated Security Surveillance System Service - Theft Prevention, Remote Video Monitoring, Facility/asset Protection, Monitor Operations, Vandalism Deterrence, Event Video Surveillance, Dock Management Solution, Outdoor Perimeter Secu 2026-04-09
India Tender Invited For Wrk-pkg-3dmodel-ff##quantity: 3769## 2026-04-09
-Design,-Supply,-Installation,-Testing-And-Commissioning-Of-Turnkey-Upgradation-Of-Auditorium-At-Gati-Shakti-Vishwavidyalaya,-Vadodara>India -Design,-Supply,-Installation,-Testing-And-Commissioning-Of-Turnkey-Upgradation-Of-Auditorium-At-Gati-Shakti-Vishwavidyalaya,-Vadodara>Eoi For Upgradation Of Auditorium
Design, Supply, Installation, Testing And Commissioning Of Turnkey Upgradation Of Auditorium At Gati Shakti Vishwavidyalaya, Vadodara
-Design,-Supply,-Installation,-Testing-And-Commissioning-Of-Turnkey-Upgradation-Of-Auditorium-At-Gati-Shakti-Vishwavidyalaya,-Vadodara>2026-04-09
India Rtgh Auction 01/2025-26 2026-04-09
India E- Tender Notice For Transportation Of Lottery Tickets From Kbps To Various Lottery Offices All Over 14 Districts In Kerala 2026-04-09
India Hubballi Division: Proposed Construction Of Station Approach Road Along With Storm water Drain And Improvements To Land Scaping In Lower Circulating Area At Hubballi railway Station.(maintenance Period:06 Months) 2026-04-09
India Hubballi Division: Strengthening Of Pit Line-1 In Hubballi (ubl) Yard. maintenance Period:06 Months. 2026-04-09
India Hubballi Division:- Proposed Construction Of Type-ii (16 Units) At Vidyaranya Nagar railway Colony In Lieu Of Quarter No.1327(a-p) Hubballi.(maintenance Period: 36 months) 2026-04-09
India Supply, Delivery, Fitting, Fixing Of Soft Starter For Pump Motor Unit - 2 And Replacement Of The Bearing Of Pump Unit - 1 With Allied Works At Clear Water Booster Pumping Station Under South Dumdum Municipality. Soft Starter 2026-04-09
Malaysia Tender To Supply And Send Consumables Cassette For Low Temperature Plasma Hydrogen Peroxide Gas Sterilizer In Stages For A Period Of 3 Years To Hospital Tuanku Muhriz Chancellor Hctm And Tunku Ampuan Besar Tuanku Aishah Rohani Hospital, Child Specialist H 2026-04-09
Whats app