Filter Search


Asia-Pacific


Location Summary Deadline
India Connection Of 250kva Transformer Nsc Conn.250kva Arjunda 2026-04-25
India Drinking Water Supply Distribution 2026-04-25
India Supply Of Drinking Water Through Tanker Lorries Equipped With Gps System. Tanker Lorries 2026-04-25
India Supply Of Drinking Water Through Tanker Lorries In The Pothecode Grama Panchayat. Tanker Lorries 2026-04-25
India Earth Work In Excavation For Removing The Leakage And Blockage Ci/pvc/gi Pipe Line For Solved The Dirty Water Complaint Including Bailing Out Water Cost, Cid/joint, Socket, Spindle Repair And Pvc Solution Etc Complete & Other Works Contingent There Too. O 2026-04-25
India Providing Platform At Adult Education Department For Ph.d. Section Burnt Brick, Cement, Sand, Steel, Roofing Sheets 2026-04-25
India Supply Of Stator Coil Suitable For 230 .#* Supply Of Stator Coil Suitable For 230 V Ac Single Inlet Blower Motor Of Lhb Co aches As Per Sample [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2026-04-25
India Raising Of Plantation At Somlakere Sy No 297, 25 Ha. In Challakere Social Forestry Range, During 2026-27.(reserved For Sc Category) 2026-04-25
India Raising Of Road Side Plantation At Hariyabbe - Venukallugudda In Hiriyur Social Forestry Range, 3 Km During 2026-27 2026-04-25
Russian Federation The Right To Conclude A Contract For The Execution Of A Complex Of Works On The Investment Project "construction Of A 110/10 Kv Transformer Substation With Two Open-type Transformers With A Capacity Of 25 Mva For The Power Supply Of The Construction Of En 2026-04-25
Whats app