Filter Search


Asia-Pacific


Location Summary Deadline
India Auction Sale Of Commercial Property*#. Item 1: All That Piece And Parcels Of Commercial Property Land Within Mouza Bankra, P.s And S.r Office Kashipur, J.l No 176, L.r Dag No 519, L.r Khatian Nos. 2422, 2710, 2433 At Adra Raghunathpur Road, Upper Beniasol 2026-04-06
India Auction Sale Of Property Commercial Shop 42.93 Sq.mtr. 3 Taloja 2026-04-06
India Service Contract For Pest Control At Control And Server Rooms Of Four Units And It Server Room With Associated Areas Under C And I, Itc Dept. 2026-04-06
India This Bid Is Published In Gem Platform Please Submit Your Quotations Through Gem Only. Bids Through Toc Will Not Be Acceptable.*#.mechanical And Electrical Maintenance Jobs General Inst 2026-04-06
India Selection Of Irrigation Service Provider (isp) For The Development Of Pressurized Piped Irrigation Network (ppin) And Provision Of Irrigation Services In Bhadali Distributary Of The Left Bank Canal Of Waghur Project, Tal. Dist.jalgaon 2026-04-06
India Supply Of Alumina Ceramic Tiles For Coal Pulverizer Of Unit 5 And 6 Csctpp, Chhabra 2026-04-06
India Supply Of Mechanical Spares For L And T Make Esp System Installed At Unit 5 And 6,(2x660mw), Csctpp, Rvun, Chhabra 2026-04-06
India Repairing Of Link Road Asam Road To Nainiha To Gurudwara 2026-04-06
India Repairing Of Link Road Agaiya To Bedubhar. 2026-04-06
-Requirement-Of-Shifting,-Erection,-Testing,-Commissioning-Of-415-V-Lt-Switchgear-Panels-For-Lp-Vacuum-Pumps-(-01-Nos.)-And-Hp-Vacuum-Pumps(-01-Nos.)-Of-U#5-From-Dol-Feeder-To-Lt-Acb-Feeder-In-Front-Of-Turbine>India -Requirement-Of-Shifting,-Erection,-Testing,-Commissioning-Of-415-V-Lt-Switchgear-Panels-For-Lp-Vacuum-Pumps-(-01-Nos.)-And-Hp-Vacuum-Pumps(-01-Nos.)-Of-U#5-From-Dol-Feeder-To-Lt-Acb-Feeder-In-Front-Of-Turbine>Setc Of Lt Acb Panels At Csctpp Chhabra
Requirement Of Shifting, Erection, Testing, Commissioning Of 415 V Lt Switchgear Panels For Lp Vacuum Pumps ( 01 Nos.) And Hp Vacuum Pumps( 01 Nos.) Of U#5 From Dol Feeder To Lt Acb Feeder In Front Of Turbine
-Requirement-Of-Shifting,-Erection,-Testing,-Commissioning-Of-415-V-Lt-Switchgear-Panels-For-Lp-Vacuum-Pumps-(-01-Nos.)-And-Hp-Vacuum-Pumps(-01-Nos.)-Of-U#5-From-Dol-Feeder-To-Lt-Acb-Feeder-In-Front-Of-Turbine>2026-04-06
Whats app