Filter Search


Asia-Pacific


Location Summary Deadline
Russian Federation Polymers, Chemical Vol., Fiberglass And Ed. Tube Here, Mat, Sealant, Cuff And More 2026-03-11
India Air Spring Height Go And No Go Gauge As Per Drg. No. Cws/bct/2020/05 Dt. 25/11/2020, Calibration Certificate Should Be Provided For Each Gauge From Nabl approved Lab . .#* Air Spring Height Go And No Go Gauge As Per Drg. No. Cws/bct/2020/05 Dt. 25/11/2020 2026-03-11
India Supply And Fixing Of New Cpvc Pipe Line In Place Of Old & Damaged Gi Pipe Line For Earth Pits At 220/132/33kv Sub-station Nirmal In Omc Circle, Adilabad. 2026-03-11
China Vertical Annealing Furnace 2026-03-11
Japan Cluster-type Sputtering System For Single-wafer Processing 1 Set 2026-03-11
India Comprehensive Maintenance To Certain Otm Accn Incl E/m Of Med Regt, Arty Bde And Absc Under Age B/r-ii At Itarana Cantt Alwar 2026-03-11
India Arrangement For Reflector Indicator Board Drawing No:- Wd-01064-s-01, Alt- Nil Or latest. .#* Arrangement For Reflector Indicator Board Drawing No:- Wd-01064-s-01, Alt- Nil Or Latest [ W arranty Period: 30 Months After The Date Of Delivery ] ] 2026-03-11
-Mirzapur-banshihari-Road-From-Ch.-8.00-Km-To-Ch.-14.600-Km,-Surfacing-Work-Under-Malda-Highway-Division,-In-The-District-Of-Malda.>India -Mirzapur-banshihari-Road-From-Ch.-8.00-Km-To-Ch.-14.600-Km,-Surfacing-Work-Under-Malda-Highway-Division,-In-The-District-Of-Malda.>Wbpw(roads)/sr. Se/ Nhc /nit-09 /2025-2026/01
Mirzapur-banshihari Road From Ch. 8.00 Km To Ch. 14.600 Km, Surfacing Work Under Malda Highway Division, In The District Of Malda.
-Mirzapur-banshihari-Road-From-Ch.-8.00-Km-To-Ch.-14.600-Km,-Surfacing-Work-Under-Malda-Highway-Division,-In-The-District-Of-Malda.>2026-03-11
-Dc-O>India -Dc-O>Dc Of Twin Tunnel By Shield Tbm From Shivaji Stadium Station (excluding) To Central Secretariat Station (excluding Chainage 32334.986 To 32539.986 M With Entry/exits And Connecting Subways For Central Vista Corridor Of Phase-v(a) Of Delhi Mrts.
Dc O
-Dc-O>2026-03-11
India Epc Package For Development Of 1000 Mwh Bess Capacity At Ntpc Rel Bikaner Solar Plant. Bess 2026-03-11
Whats app