Filter Search


Asia-Pacific


Location Summary Deadline
Japan Respirator 1 Set 2026-07-08
-Pre-despatch-Inspection,-Supply,-Installation-And-Commissioning-And-Warranty-Of-High-Performance-Computing-Cluster-As-Per-Attached-Annexure.>India -Pre-despatch-Inspection,-Supply,-Installation-And-Commissioning-And-Warranty-Of-High-Performance-Computing-Cluster-As-Per-Attached-Annexure.>High Performance Computing Cluster
Pre-despatch Inspection, Supply, Installation And Commissioning And Warranty Of High Performance Computing Cluster As Per Attached Annexure.
-Pre-despatch-Inspection,-Supply,-Installation-And-Commissioning-And-Warranty-Of-High-Performance-Computing-Cluster-As-Per-Attached-Annexure.>2026-07-08
India Control Rod For Boxn Wagon .#* Control Rod For Boxn Wagon Dimensions- A=1256/1254 Mm & B=160 Mm To Drg. No. - Wd- 82064-s-10 Rc, Item-2, Alt-12 [ Warranty Period: 36 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : N 2026-07-08
India Dust Shield .#* Dust Shield Drg. No. Wd-97049-s/3, Alt-12, Item No. 7 Material To Is:1079/2017, Trade-h ro [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation perm 2026-07-08
India Supply Of Male Elbow Connectors With A Size Of 1/2" Od And 1/2" Bspt (m), Designed For Use In Railway Applications. Male Elbow Connector 1/2" Od X 1/2" Bspt (m) 2026-07-08
Thailand Purchasing 2 Items Of Transformer Shortage Items With Budget 2.4, No. 3, ??.(??.)ebm14/2569 By Means Of Electronic Bidding (e-bidding) 2026-07-08
Japan Medical Materials, Such As Unit Price Contract 1 Set 2026-07-08
Kiribati 1010/1011- Kir: South Tarawa Renewable Energy Project Phase-2 2026-07-08
Japan Jp Cast Outsourcing Of Operational Work, Etc. 1 Set 2026-07-08
Japan Integrated Management Support For The Japan Health Insurance Association System 2026-07-08
Whats app