Filter Search


Asia-Pacific


Location Summary Deadline
India A Total Of 31 Shops At Saptahik Bazar Area, Bhua Bichhiya - (ground Floor) Shop No. 18 2026-06-08
India Bw Cons. 4lane Gf Dake From Jalandhar Moga Road (nh703) To Jalandhar-kapurthala Road (nh703a) (km 303.900 To 319.400) And Jalandhar Moga Road (nh703) To Kapurthala Sultanpur Lodhi Road (nh703a) (km 0 To 24.000) In Punjab (p10) 2026-06-08
India The Project Involves The Disposal Of Scrap Materials From Various Itis, Including Iti Dashrath, Iti Savli, Iti Shinor, And Iti Desar. The Nature Of Work Includes The Collection And Removal Of Metallic Scrap. Scrap 2026-06-08
India Construction And Development Of Green Belt From Rob To Nh 79 At Pragati Path 2026-06-08
India Box Complete (for Battery Fuse And Eft) .#* Box Complete (for Battery Fuse And Eft) To Icf Drawing No. Gs-7-1 022, Alt. H. Fitted With battery Fuse Arrangement As Per Icf Drawing No. Wfc2-7-1-207, Alt. F And Double Fuse As Per Rdso Dr awing No. Rdso/pe/sk 2026-06-08
Mongolia Construction Of Forensic Buildings, Supply Of Medical Equipment, Development Of Integrated Electronic Information Systems For Forensic Institutions, Information Technology Equipment Device Supply 2026-06-08
India Pediatric Icu Beds (high End) 2026-06-08
Taiwan Province of China Hsinta Power Plant Barge Terminal And Connecting Pier Demolition Project (including Tender Sale) 2026-06-08
India Fully Machined Shaft For Hitachi T.m. Armature .#* Fully Machined Shaft For Hitachi T.m. Armature As Per Hitachi Ltd. Drg.no. 1tms/cnb/drg/ 2008/12 Alt-1 And Confirming To Spec. No. 4tms.095.005, Rev-0, Alt-3. [ Warranty Period: 30 Months After T he Date 2026-06-08
Japan Creation Of Demand Letters (crimped Postcard Format) And Preparation For Shipping, Planned Quantity: 2, 399, 100 2026-06-08
Whats app