Filter Search


Asia-Pacific


Location Summary Deadline
India Main Pcb With Led Cluster .#* Main Pcb With Led Cluster For M/s. Vgs Technologies Make Led Based Emergency Light Fittings As Per Rdso Spec n. No. Rdso / Pe / Spec / Ac / 0180 - 2016 Rev. 0 [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2026-06-09
Philippines 26dn0011-preventive Maintenance -tertiary Roads - Marikina-infanta Rd - K0026 + 051 - K0026 + 279, Antipolo City (second District) 2026-06-09
-Providing-House-Keeping-Services-For-O-&-M-Urban-And-Rural-Division-Office-Building-Tabibland-Hubballi-O>India -Providing-House-Keeping-Services-For-O-&-M-Urban-And-Rural-Division-Office-Building-Tabibland-Hubballi-O>Providing House Keeping Services For O & M Urban And Rural Division Office Buildingtabibland Hubballi On Contract Basis Through Outsource Agency
Providing House Keeping Services For O & M Urban And Rural Division Office Building Tabibland Hubballi O
-Providing-House-Keeping-Services-For-O-&-M-Urban-And-Rural-Division-Office-Building-Tabibland-Hubballi-O>2026-06-09
-Supply-Of-Ldpe-Black-Polythene-Sheets-During-2026-27>India -Supply-Of-Ldpe-Black-Polythene-Sheets-During-2026-27>Ldpe Black Polythene Sheets Of Length From 1.20mtr To 1.80mtr. No Recycled Material To Be Used. The Measurement Should Be Uniform And Accurate. Must Withstand Drop Test. Is- 2508-84.
Supply Of Ldpe Black Polythene Sheets During 2026-27
-Supply-Of-Ldpe-Black-Polythene-Sheets-During-2026-27>2026-06-09
India Lowering, Lifting And Repairing Of Pumping Sets, Motor Starter Panel And Connected Works And Repair /maint Of Sewage Pumps, Motor Starter, Pressure Pipe And Cleaning Of Sewage Well At Mil Stn Kota 2026-06-09
India Electrical Work In C/w Upgradation And Provision Of Rdso-based Vss (video surveillance System) At Svdk Station Under Jammu Division 2026-06-09
India 24v Dc Fail Safe Electronic Flasher Device. .#* Supply Of 24v Dc Fail Safe Electronic Flasher Device As Per Specification No. Rdso/spn/173/2 002 With Amd-2 Or Latest. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2026-06-09
-Bhel/cpc/krd/epc_lhpghp/27/023-For-Epc-Package-For-Lime-Handling-Plant,-Gy>India -Bhel/cpc/krd/epc_lhpghp/27/023-For-Epc-Package-For-Lime-Handling-Plant,-Gy>Epc Package For Lime Handling Plant, Gypsum Handling Plant And Bottom Ash Hopper At 2x660 Mw, Mspgcl Koradi Thermal Power Station, Unit-11 And 12, Koradi, Nagpur, Maharashtra
Bhel/cpc/krd/epc_lhpghp/27/023 For Epc Package For Lime Handling Plant, Gy
-Bhel/cpc/krd/epc_lhpghp/27/023-For-Epc-Package-For-Lime-Handling-Plant,-Gy>2026-06-09
India Amrut-2.0- Design And Construction Of 25 Ll Capacity Ohsr At Chammravattam Junction In Ponnani Municipality -pipeline Work 2026-06-09
Vietnam Package No. 8: Construction Supervision Consulting 2026-06-09
Whats app