Filter Search


Asia-Pacific


Location Summary Deadline
India Procurement Of Polaroid Simulator/pole Wheel Simulator For Speed sensor Of Wsp System Of Lhb Coaches .#* Polaroid Simulator/pole Wheel Simulator For Speed Sensor Of Wsp System Of Lh b Coaches With One Set Of Extra Battery. Note :- Sample To Be Approved Be 2026-05-04
Russian Federation The Right To Conclude A Contract For The Performance Of Work On The Preparation Of The Construction Site Of Building 811 Of Jsc Aehk Stage I 2026-05-04
India Overhauling Kit For Poh Of Casnub Bogie .#* Overhauling Kit For Poh Of Casnub Bogie Having Sona Blw Make Bmbs System Confirming to Rdso Spec. Wd-23-bmbs-2008 Rev-1, Amndt-1 Of Sept.2016 And Drg. No. Wd-08093-s-02 Alt.03 (one kit Contains Following 14 Item 2026-05-04
Malaysia Tender For Rental Services Of Printer/photostat And Ink/master Supply For Risograph Machine To Tuanku Fauziah Hospital, Kangar Perlis For A Period Of Three 3 Years 2026-05-04
India Madurai Division - Ohe Modification Work In Connection With The Provision Of additional Platform Shelters In Krmg, Krur, Vel, Tym, Ctnd Stations And replacement Of Old Ac Sheet Roofing In Existing Platform Shelters At Svga, Sux, sqd, Ucp Stations. 2026-05-04
India Pm1 Rectifier Snubber Capacitor .#* Pm1 Rectifier Snubber Capacitor (abb Part No.- 3bhe035244r0001) For M/s Abb Make A uxiliary Converter.make Of Capacitor M/s Vishay (pec Capacitor Esta Prop, Emkp 2100, Cn=1.5uf 0/+ 10%, Un=2100v, U Rms=900v) Being Used 2026-05-04
-As-Per-Nit>India -As-Per-Nit>Work No 35 Out Of 42 Works
As Per Nit
-As-Per-Nit>2026-05-04
-Repair-/-Maintenance-Of-The-Rural-Roads/cds-For-Five-Years,-Constructed-Under-Pradhan-Mantri-Gram-Sadak-Yojna-And-Other-Scheme--Post-10-Year-Maintenance-(bw)>India -Repair-/-Maintenance-Of-The-Rural-Roads/cds-For-Five-Years,-Constructed-Under-Pradhan-Mantri-Gram-Sadak-Yojna-And-Other-Scheme--Post-10-Year-Maintenance-(bw)>Mp44ptn023 (bw)/umaria
Repair / Maintenance Of The Rural Roads/cds For Five Years, Constructed Under Pradhan Mantri Gram Sadak Yojna And Other Scheme- Post 10 Year Maintenance (bw)
-Repair-/-Maintenance-Of-The-Rural-Roads/cds-For-Five-Years,-Constructed-Under-Pradhan-Mantri-Gram-Sadak-Yojna-And-Other-Scheme--Post-10-Year-Maintenance-(bw)>2026-05-04
Australia Aviation Command Operating Model Review - Yr-2026-0012 2026-05-04
Philippines Construction Of Multi-purpose Building At Lgu Farm Phase Iii 2026-05-04
Whats app