Filter Search


Asia


Location Summary Deadline
-Repairing-And-Relaying-Of-Hdpe-Pipe-Line-From-Anchuri-Health-Centre-Towards-Namoanchuri-Village-For-Anchuri-(zone---T)-Under-Bankura---I,ii-And-Barjora-Block-W/s-Scheme-(brgf-Ph---I>India -Repairing-And-Relaying-Of-Hdpe-Pipe-Line-From-Anchuri-Health-Centre-Towards-Namoanchuri-Village-For-Anchuri-(zone---T)-Under-Bankura---I,ii-And-Barjora-Block-W/s-Scheme-(brgf-Ph---I>Niet No. - 29 Of The Fy 2025-2026 Of The Ee/bqa, Phe Dte.(sl.no-05)
Repairing And Relaying Of Hdpe Pipe Line From Anchuri Health Centre Towards Namoanchuri Village For Anchuri (zone - T) Under Bankura - I,ii And Barjora Block W/s Scheme (brgf Ph - I
-Repairing-And-Relaying-Of-Hdpe-Pipe-Line-From-Anchuri-Health-Centre-Towards-Namoanchuri-Village-For-Anchuri-(zone---T)-Under-Bankura---I,ii-And-Barjora-Block-W/s-Scheme-(brgf-Ph---I>2026-02-13
-Special-Repairing-For-House-Connections-And-Laying-Of-Balance-Distribution-System-Of-Pipeline-With-Allied-Works-At-Kalakuri,-Bharatpur,-Nabagram,-Shirpura-And-Ituri-Village-For-Uday>India -Special-Repairing-For-House-Connections-And-Laying-Of-Balance-Distribution-System-Of-Pipeline-With-Allied-Works-At-Kalakuri,-Bharatpur,-Nabagram,-Shirpura-And-Ituri-Village-For-Uday>Niet No. - 29 Of The Fy 2025-2026 Of The Ee/bqa, Phe Dte.(sl.no-06)
Special Repairing For House Connections And Laying Of Balance Distribution System Of Pipeline With Allied Works At Kalakuri, Bharatpur, Nabagram, Shirpura And Ituri Village For Uday
-Special-Repairing-For-House-Connections-And-Laying-Of-Balance-Distribution-System-Of-Pipeline-With-Allied-Works-At-Kalakuri,-Bharatpur,-Nabagram,-Shirpura-And-Ituri-Village-For-Uday>2026-02-13
-700-Mm-Dia-Di-(k9)-Pipe-Line-Reparing-And-Construction-Of-Concrete-Thurst-Block-At-Satighat-Bridge-Riverbank-Side-Of-Bankura--I,ii-And-Barjora-Block-(including-Bulk-Supply-Of-Bankur>India -700-Mm-Dia-Di-(k9)-Pipe-Line-Reparing-And-Construction-Of-Concrete-Thurst-Block-At-Satighat-Bridge-Riverbank-Side-Of-Bankura--I,ii-And-Barjora-Block-(including-Bulk-Supply-Of-Bankur>Niet No. - 29 Of The Fy 2025-2026 Of The Ee/bqa, Phe Dte.(sl.no-07)
700 Mm Dia Di (k9) Pipe Line Reparing And Construction Of Concrete Thurst Block At Satighat Bridge Riverbank Side Of Bankura- I,ii And Barjora Block (including Bulk Supply Of Bankur
-700-Mm-Dia-Di-(k9)-Pipe-Line-Reparing-And-Construction-Of-Concrete-Thurst-Block-At-Satighat-Bridge-Riverbank-Side-Of-Bankura--I,ii-And-Barjora-Block-(including-Bulk-Supply-Of-Bankur>2026-02-13
-Repairing-And-Renovation-Of-Pump-House,-Cwr,-Staff-Room,-Guard-Room,chlorine-Room,-Sedcel-Room,-Boundary-Wall-And-Meter-Room-Etc.-Aguri-Band-Punisol-And-Adjoining-Mouzas-Water-Suppl>India -Repairing-And-Renovation-Of-Pump-House,-Cwr,-Staff-Room,-Guard-Room,chlorine-Room,-Sedcel-Room,-Boundary-Wall-And-Meter-Room-Etc.-Aguri-Band-Punisol-And-Adjoining-Mouzas-Water-Suppl>Niet No. - 29 Of The Fy 2025-2026 Of The Ee/bqa, Phe Dte.(sl.no-08)
Repairing And Renovation Of Pump House, Cwr, Staff Room, Guard Room,chlorine Room, Sedcel Room, Boundary Wall And Meter Room Etc. Aguri Band Punisol And Adjoining Mouzas Water Suppl
-Repairing-And-Renovation-Of-Pump-House,-Cwr,-Staff-Room,-Guard-Room,chlorine-Room,-Sedcel-Room,-Boundary-Wall-And-Meter-Room-Etc.-Aguri-Band-Punisol-And-Adjoining-Mouzas-Water-Suppl>2026-02-13
Nepal Medicine Goods Bid Invitation 2026-02-13
Nepal Road Improvement And Structural Works Along Hetauda-samari-bhaise-lamidanda Section Of Trp (nh41), Makwanpur 2026-02-13
-Panrui-Batikar-Road-From-8.80-Km-To-10.24-Km-And-Batikar-Kurmitha-Road-From-0.00-Kmp-To-1.30-Km-(from-Khustigiri-To-Batikar)---Strengthening-Work-Along-With-Other-Ancillary-Work-Under-Birbhum-Highway-Division>India -Panrui-Batikar-Road-From-8.80-Km-To-10.24-Km-And-Batikar-Kurmitha-Road-From-0.00-Kmp-To-1.30-Km-(from-Khustigiri-To-Batikar)---Strengthening-Work-Along-With-Other-Ancillary-Work-Under-Birbhum-Highway-Division>Wbpw(r)d/nit- 24 Of Se/whc-i/2025-2026/1
Panrui Batikar Road From 8.80 Km To 10.24 Km And Batikar Kurmitha Road From 0.00 Kmp To 1.30 Km (from Khustigiri To Batikar) - Strengthening Work Along With Other Ancillary Work Under Birbhum Highway Division
-Panrui-Batikar-Road-From-8.80-Km-To-10.24-Km-And-Batikar-Kurmitha-Road-From-0.00-Kmp-To-1.30-Km-(from-Khustigiri-To-Batikar)---Strengthening-Work-Along-With-Other-Ancillary-Work-Under-Birbhum-Highway-Division>2026-02-13
-Panrui-Batikar-Road-From-5.73-Km-To-8.80-Km-(from-Brahmandihi-To-Khustigiri)---Strengthening-Work-Along-With-Other-Ancillary-Work-Under-Birbhum-Highway-Division-ii,-In-The-District-Of-Birbhum.>India -Panrui-Batikar-Road-From-5.73-Km-To-8.80-Km-(from-Brahmandihi-To-Khustigiri)---Strengthening-Work-Along-With-Other-Ancillary-Work-Under-Birbhum-Highway-Division-ii,-In-The-District-Of-Birbhum.>Wbpw(r)d/nit- 24 Of Se/whc-i/2025-2026/2
Panrui Batikar Road From 5.73 Km To 8.80 Km (from Brahmandihi To Khustigiri) - Strengthening Work Along With Other Ancillary Work Under Birbhum Highway Division-ii, In The District Of Birbhum.
-Panrui-Batikar-Road-From-5.73-Km-To-8.80-Km-(from-Brahmandihi-To-Khustigiri)---Strengthening-Work-Along-With-Other-Ancillary-Work-Under-Birbhum-Highway-Division-ii,-In-The-District-Of-Birbhum.>2026-02-13
-State-Clean-Air-Programme-Scap-Different-Civil-Works>India -State-Clean-Air-Programme-Scap-Different-Civil-Works>Bharuch Nagarpalika
State Clean Air Programme Scap Different Civil Works
-State-Clean-Air-Programme-Scap-Different-Civil-Works>2026-02-13
Nepal Construction Works Bid Invitation 2026-02-13
Whats app