Filter Search


Asia


Location Summary Deadline
Uzbekistan Loan 4426-uzb: Rural Roads Resilience Sector Project - Rrrsp-w08: Civil Works For The Rehabilitation And Performance-based Maintenance Services Of Rural Roads In Navoi Region Lots 1, 2 And 3 2026-03-19
Nepal Collateral Assets Auction 2026-03-19
India Construction Of 2-lane Road Over Bridge In Lieu Of Existing Level Crossing No. 27/spl/t At Km 366/10-12, 4 Nos. Rub/lhs In Lieu Of Existing Level Crossing No. 29/c/t At Km 375/23-25, Lc No. 30/c/e At Km 378/11-13, Lc No. 31/c/e At Km 382/7-9 & Lc No. 14/a 2026-03-19
India Dev 6lac Hiway Start Jn With Nh60 At Adgaon138.00 To Ahilyanagar290.00 Sec2 Onm Of Hiways Frm Nashik 205.310 To Sinnar 180.00 Then 180.000 To Nandurshingote 162.900 Nandurshingote 0.00 To Kolhar 47.37 Kolhar 82.800 To Ahilyanagar Bypass126.564 Of Nh1 2026-03-19
Nepal Eoi For Consulting Service 2026-03-19
Japan Original Gold Products Etc 2026-03-19
Japan Notice Of Procurement (goods & Services)?fuel Oil A, Quantity April~july (tsushima Coast Guard Office Storage Tank) About 113, 000l, ?fuel Oil A, Quantity August~november (tsushima Coast Guard Office Storage Tank) About 136, 000l, ?fuel Oil A, Quantity De 2026-03-19
India Union Melt Powder .#* Union Melt Powder Cu Coat Gr50 Under Irs Class 1 Irsm 39/01 Class Code [ W arranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitt ed: Max 8 2026-03-19
India Cons Of 6l Gf Ac Indore Eastern Bypass From Km 113.000 On Nh 347bg Near Simrol/datoda End At Km 139.630 Nanded Pkg2 Of Indore Dist N Rehab N Upgrade Of Exist Nh52 From Km 18.000 Khandwa To Km 27.000 Ahilyapur From 4to6l Pkg2 Of Indore In Mp On Ham 2026-03-19
India Upper Rubber Washer For Bogie Bolster Suspension In Ac Coaches. .#* Upper Rubber Washer For Bogie Bolster Suspension In Ac Coaches. Drawing No: Icfs Drg . No. Wtac3-0-5-302, Alt. J / 8. Matl.& Specn : Irs: R-64 / 98 (rev. 2). [ Warranty Period: 15 Months 2026-03-19
Whats app